Aim
To review the Overall Criticality, i.e., base risk for (each) Component – DM combination.
Criticality, together with Confidence (Step10) and RL (Step 6), is used to determine the Maximum Inspection Interval (MII) and Inspection Strategy (IS) (Step 11).
See Methodology Step 9 and Software Step 9.


(4).jpg?sv=2022-11-02&spr=https&st=2025-12-10T16%3A20%3A34Z&se=2025-12-10T16%3A31%3A34Z&sr=c&sp=r&sig=xkp6v3hR%2B5G2DNn3S41FZ94sI9PDznyyFb5PO2c1N%2FU%3D)