Note: To view categories like Release Notes, Site-Specific Documents, and Recommended Practices, click Login in the top-right corner. If you don’t have a login, sign up with your work email.

Approving PLSS ECHs and Findings

Prev Next

After data has been imported, draft ECHs will be available.

If there are no issues, all ECH can be approved in bulk. See Approve PLSS ECHs in Bulk

If there are issues, the Indicator will be red.  In that case, the pipeline engineer should review the data first. ECHs with a red indicator can only be approved on the ECH itself. See Approving PLSS ECHs.

All ECHs have to be Final Approved before the campaign can be closed. Approving the ECHs will close the campaign.

Close the Campaign and create a new one

The Campaign will be closed automatically when all Schedules have an approved ECH attached to them.

If for a reason, the activity on the Schedule is not performed, then the Schedule should be removed from the Campaign.