This online manual refers to the PEI (Civil) module in IMS.

To start:

  • First include Civil in the PEI module by ticking Include CIVIL. Note; if unchecked, Civil Equipment will be excluded from the PEI module.
  • For simplicity, untick Include PEI so that PEI (Only CIVIL) show.

When PEI is not included, items that are not applicable to CIVIL do not show, e.g. Circuits and Corrosion Loops. (When PEI is also included, it shows PEI (with CIVIL).) 

 Include Civil in the PEI module.

For more information on the IMS Interface see Navigating IMS Main Menu Items, IMS Main Screen (Grid List) and IMS Details Page.

The RBI Analysis Tab 

The RBI Analyses can be accessed by clicking the RBI icon on the Toolbar, or by selecting it from the Component detail page. See Step 2 Start Civil RBI Analysis, assign DMs & define credible Failure Scenario.

RBI icon on the Toolbar.

Each row in the lowest section of the RBI Analysis tab window represents a Component - DM combination. The active row of the main window is highlighted in blue.

The RBI Analysis tab window. Each row represents a Component - DM combination. 

Grid Columns

The Grid columns present the following data:

  • Status
  • Type
  • Review
  • Equipment
  • Components
  • Schedule ID
  • Name
  • Material
  • Degradation Mechanism (DM) Name
  • Unit
  • Stf: Susceptibility to Failure
  • Asset: Economic Consequence score
  • People: Health & Safety Consequence score
  • Env: Environment Consequence score
  • Cri: Criticality rating
  • Q1: Confidence question 1
  • Q2: Confidence question 2
  • Q3: Confidence question 3
  • Q4: Confidence question 4
  • Con: Confidence Rating
  • RL (year): Remnant life in years
  • IF: Interval Factor
  • MII (year): Maximum Inspection Interval
  • LII (year): Legal Local Interval
  • NID: Next Inspection Date
  • Add to scope
  • Add NDE

Buttons

The following buttons are available in the RBI Analysis tab toolbar.

RBI Analysis toolbar buttons

  • Edit
  • Add/Remove Degradation Mechanism (DM)
  • Change DM
  • Export
  • Copy
  • Paste
  • Add to scope
  • Open ECH
  • Analysis Status (e.g. completed)

Tabs

The following tabs are available in the upper part of the screen:

  • Inspection History
  • Criticality Assessment
  • Remnant Life
  • Risk
  • LCC
  • Confidence
  • Narratives
  • NID

Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence