Release Notes
Glossary
Symbols Guide
Book a Training
Request Support
Login
Beta
Ask Eddy AI
Contents
x
IMS Platform (General)
User Support
PEI
Fabric Maintenance
Civil
RCM
FCM
PLSS
TAT
SIS
Document History and Authors
Powered by
Creating Jobs and ECHs in FCM
7 Articles
in this category
Contributors
+ 1
Print
Dark
Light
Contents
Creating Jobs and ECHs in FCM
7 Articles
in this category
+ 1
Written by
Tomislav Renic
,
Elsa Tolsma
,
Marko Bozac
and 1 others
Dark
Light
FCM Jobs and ECHs - Overview
This section of the Handbook describes how Jobs can be created and managed in FCM. Jobs in FCM are a self-contained entity that groups together Schedules to conduct Preventative or Corrective maintenance on Flange Connections (Flanges and Grayl...
Written by
Tomislav Renic
Updated on : 09 Aug 2024
Creating a Job
Jobs in FCM After Flange or Grayloc Equipment have been defined , Jobs can be created. The purpose of a Job is to group together Schedules associated with Flange or Grayloc Equipment so that the scope can be easily managed and carried out in th...
Written by
Elsa Tolsma
,
Tomislav Renic
Updated on : 09 Aug 2024
Job Details Page
To view the Details page for any Job, click on the Job name in the Main Grid. The Job Details Page will be opened. Job Details Page. The Job Details page shows information related to the current Job and contains several sections: Details ...
+ 1
Written by
Marko Bozac
,
Elsa Tolsma
,
Denis Tkalec
and 1 others
Updated on : 09 Aug 2024
Job Scope
When a Job is created, its Scope is defined by adding/removing Flange Connections (Grayloc or Flange Equipment) to/from it. Adding Flange Connections to a Job Flange Connections can be added to an existing Job from two locations on the Job Detail...
+ 1
Written by
Marko Bozac
,
Elsa Tolsma
,
Denis Tkalec
and 1 others
Updated on : 28 Nov 2024
Job Statuses and Approval
Jobs Approvals FCM uses the normal IMS Approval logic, where Approval rights are determined on a Unit level. Each user can have one of the following approval rights: Writer Approval Level 1 Approval Final Approval For more information s...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 09 Aug 2024
Creating an ECH in FCM
This section of the Handbook describes how to create ECH for Flange Equipment. Creating an ECH In IMS FCM an ECH should be created for each of the Flange Connections that are included in a Job's Scope. To start creating ECHs for the Flanges...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 09 Aug 2024
Completing an ECH in FCM
By completing an Inspection, ECHs will be created for the Flange Connections included in the Job Scope upon the completion of all of the steps of an Inspection. Starting an Inspection When a Job's Status has been set to FINAL APPROVAL (see&nbs...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 09 Aug 2024
Change password!
Changing your password will log you out immediately. Use the new password to log back in.
Current password
Current password is required
New password
New password must be at least 8 characters long. It should contain at least one upper and lower case letter, number, and a special character.
Confirm password
Confirm password must be at least 8 characters long. It should contain at least one upper and lower case letter, number, and a special character.
Confirm password should be same as new password
Update
Change profile
Success!
First Name
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last Name
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
New email
Enter a valid email
Re-enter your password
Enter a valid password
Your profile has been successfully updated.
Update
Logout
ENTER
ESC
Eddy AI, facilitating knowledge discovery through conversational intelligence
Search Limit Exceeded. Please upgrade the plan.
Answer copied!
No results found
Provide more context or information so that I can better understand and assist you