Release Notes
Glossary
Symbols Guide
Book a Training
Request Support
Login
Beta
Ask Eddy AI
Contents
x
IMS Platform (General)
User Support
PEI
Fabric Maintenance
Civil
RCM
FCM
PLSS
TAT
SIS
Document History and Authors
Powered by
Defining Schedules
7 Articles
in this category
Contributors
+ 1
Print
Dark
Light
Contents
Defining Schedules
7 Articles
in this category
+ 1
Written by
Elsa Tolsma
,
Marko Knezevic
,
Denis Tkalec
and 1 others
Dark
Light
Defining Inspection Schedules
The following must be taken into account when defining Inspection Schedules. The Rules The following rules apply to Inspection Schedules: Lifecycle Steps The Inspection Lifecycle steps are: Create Schedule – Add Scope - Add Plan Codes – ...
+ 1
Written by
Elsa Tolsma
,
Marko Knezevic
,
Denis Tkalec
and 1 others
Updated on : 26 Nov 2024
Defining CAIRs
Inspectors often need to make maintenance recommendations. Corrective Action Inspection Requests (CAIRs) can be used to “keep track” of these repair recommendations. CAIRs are Created , Defined , Approved , can also be linked to an Event , and ...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 09 Aug 2024
Defining RBI Re-Assessment Schedules
Equipment that has been assessed with RBI , must be re-assessed after at some point, based on the site requirements (e.g., 10 years per API-510/570 and 653). An RBI Re-Assessment can be created at the Equipment level or at the Unit level. RB Re-As...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 09 Aug 2024
Defining Corrosion Schedules
A Corrosion Schedule is created automatically when a Circuit is created . The Corrosion Schedule is credited when the Calc Summary on the Circuit is Final Approved . The Corrosion Schedule is automatically recurring , thus when the Ca...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 09 Aug 2024
Defining Assessment Schedules
Assessment Schedules outline the specific Assessments to be conducted over a set period. Assessment Schedules are Created , Defined , and Approved , they can also be linked to an Event , and marked for WOP , in the same way as Inspection Sche...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 08 Nov 2024
Defining PREVENTATIVE Schedules
Preventative Schedules allow us to organize preventative maintenance. They are often linked to Barriers . Preventative Schedules are Created , Defined , and Approved , they can also be linke...
Written by
Denis Tkalec
Updated on : 08 Nov 2024
Defining Static Schedules
A recurring Schedule can be labeled as a Static schedule . If labeled as a Static schedule , the NID will be based on the User Date / User Interval and will ignore the Last Inspection Date ( LID ). Static schedules are meant for...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 03 Dec 2024
Change password!
Changing your password will log you out immediately. Use the new password to log back in.
Current password
Current password is required
New password
New password must be at least 8 characters long. It should contain at least one upper and lower case letter, number, and a special character.
Confirm password
Confirm password must be at least 8 characters long. It should contain at least one upper and lower case letter, number, and a special character.
Confirm password should be same as new password
Update
Change profile
Success!
First Name
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last Name
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
New email
Enter a valid email
Re-enter your password
Enter a valid password
Your profile has been successfully updated.
Update
Logout
ENTER
ESC
Eddy AI, facilitating knowledge discovery through conversational intelligence
Search Limit Exceeded. Please upgrade the plan.
Answer copied!
No results found
Provide more context or information so that I can better understand and assist you