PLSS Equipment Main Screen
Take note
This overview will explain how to use and interpret the IMS-PLSS Equipment Main screen.
The Equipment Main screen shows an overview grid, with a list of Equipment.
Listing Equipment (the Overview Grid)
To see the list of registered Equipment:
Go to the IMS Main Menu.
Click Equipment to go to the Equipment Main Screen.
Use the scoping bar, the filter, or the search functionality to list the desired Equipment.
Each record shows several fields, summarizing the Equipment (see the table below). To see more, click on the Settings button in the toolbar and add additional fields.
Equipment Menu Toolbar
There are several shortcuts or available features that the Equipment toolbar can be used for. For more information see IMS Main Screen (Grid List).
Equipment Grid
The Equipment overview grid includes both an expanded and a collapsed view for each piece of equipment. All design data and results can be shown in the grid.
See the default Equipment data in the Equipment record in the table below:
Field/Column | Description |
---|---|
Status | The traffic light status, for pipelines and flowlines see the RBA user manual. |
PE Status | The pipeline element status, a black circle around the colour means that elements have been approved by someone, a little red dot means one or more elements have a Next Inspection Date. (Although the Pipeline Elements feature has been deprecated, the status of existing Pipeline Elements is displayed in this column.) |
Data Status | The data completeness status. The icon will be shown if one of the Warning columns for FFS, IC, EC, RBA, or Length is ticked or the Action column is marked "Needed". The Data Status will only be verified for pipelines and flowlines, not yet for the other Equipment Groups. |
Active | The Active flag shows for each Equipment whether it is active or inactive: Active Equipment Inactive Equipment |
Equipment ID | Name of the Equipment, click on the Equipment ID to open the Equipment details. |
Description | Short Description of the selected Equipment. |
RBA | If the integrity status has been overwritten an "!" will be shown in this column. See |
FFS D-M | In this column, a D=Dig up will be shown if the last FFS run is a dig-up. M=Material grade, an M will be shown if the material grade is X70 or X80. |
LID | LID (last inspection date) is the last date when an ILI (IP) run was performed. |
NID | The (Next Inspection Date) is calculated in the RBA module. An "!" will show if it has been overwritten. |
Unit | Unit to which the Equipment is assigned. |
Equipment Group | Equipment type (see Appendix 1 for a full list of available Equipment types). |
Equipment Class | Shows the Class of the Equipment (i.e. PIPELINE; DYNAMIC RISER; SUBSEA MANIFOLD). |
Remaining Life | (Earliest) Remnant Life date for all assigned Equipment Schedules. |
Data Status | The data completeness status. The icon will be shown if:
The data status will only be verified for Pipelines and Flowlines, not yet for the other Equipment groups. |
Last FFS | Shows the last FFS date, no color. Note: The ECH should be Final approved otherwise the date can be empty. |
FFS Analysis | If there is an FFS warning. FFS not analyzed or Pipeline length has changed after the analysis or the design parameters nominal wall thickness, material grade, design factor or diameter. FFS inspection after analysis. |
Last IC Assessment | The last valid internal corrosion assessment date. Data is valid if the past and future corrosion rates are both greater than zero. The cell will be colored red if
|
Last EC Assessment | The last valid internal corrosion assessment date. Data is valid if the past and future corrosion rates are both greater than zero. The cell will be colored red if
|
Int. Conf. | The result of internal Confidence Rating (L, M, H, VH). The cell will be colored red if the confidence rating has not been performed. |
Ext. Conf. | The result of external Confidence Rating (L, M, H, VH). The cell will be colored red if the confidence rating has not been performed. |
RBA Assessment date | The date of the RBA Assessment after user has filled in the confidence rating and Strategy. The cell will be colored red if:
|
Strategy | The user selected strategy, Design Intent, Extended life, or Fit for Purpose. If the strategy field is empty in the RBA module the string will be Not defined and the cell will be colored red. |
Action | The required action if one of the cells is red. The string can be:
|
FFS Warning | Warning string, from the FFS module, can be:
|
IC Warning | Warning string, from the Internal corrosion module, can be:
|
EC Warning | Warning string, from External corrosion module, can be:
|
RBA Warning | An RBA-related warning.
|
Length Warning | A warning if one of the Sections has a length greater than the length specified in the Design Data. Checks:
|
Filtering Equipment
From the Equipment Main Screen (Grid View), several filters can be used to drill down the search results for the shown list of Equipment.
To filter a list:
Click on the Filter button.
Check the filters that you want to use.
Click Show ? matching Equipment….