Step 4 Determine the most Credible Failure Scenario:
Below is explained how to implement Step 4 in the Software. See also Methodology Step 4.
To start:
- After the RBI Analysis has been started.
- Select the Component – DM combination, to be risk assessed.
- Make sure that the assessment view is expanded to show the top section.
Review the Operating Conditions
To review the Operating Conditions in IMS:
- Select the Operating conditions tab in the right section.
- Select the Product from the dropdown to lookup the Nf and Nh factors, AIT, FP, etc., if not already available. Note: If your product is missing you can request to have it added in Settings \ Maintenance \ RBI Specific Data \ Product.
- Click Apply to specs if desired.
- Use the Liquid Release Calculator or Hole Size table & Release Rate plots to determine the Release Rate.
Note: This information is specifically needed for the Detailed People Consequence Assessment in Step 8.
Review RBI Specs
To review the RBI specs in IMS:
- Select the RBI Specs tab in the left section.
- Review available specs (including the specs defined on the Equipment and Component).
- Click Edit to add additional specs.
- Click Save.
Note: S-RBI specifications are used throughout the S-RBI assessment to document key material and process data needed for the assessment. Some of the specifications input in the S-RBI assessment are stored as specifications to ensure that there is only one set of data used.
Review DM Attachments
To review the DM Attachments in IMS:
- Select the Attachments tab.
- Review the assigned DM documentation. Note: These can be imported via Settings.
Define the Credible Failure Scenario
To define the Failure Scenario in IMS:
- Select the Criticality Assessment tab.
- Click on Scenario.
- Click Edit.
- Described the Scenario, as established by the S-RBI team.
- Images and links can be added as well.
- Click Save.