MiRO Horserace

Prev Next

The Next Inspection Date (horserace) calculation is working in a similar way as in the standard IMS, except that:

  • For Corrosion Circuits the horserace is between the M-IDAP NID and the Time-Based NID.
    The Equipment horserace.Circuit horserace is between M-IDAP NID and Time-Based NID.
    Circuit Calculation Summary. In this example the M-IDAP NID wins the horserace. 
Standard PEI Instructions
To learn more about the Next Inspection Data calculation see Next Inspection Date (NID) – Horserace.