--- title: "PL Internal Corrosion - Schedule" slug: "pl-internal-corrosion-schedule" updated: 2026-10-27T23:12:11Z published: 2026-10-27T23:12:11Z canonical: "ims-handbook.cenosco.com/pl-internal-corrosion-schedule" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # PL Internal Corrosion - Schedule Take noteThis overview explains what the Schedule section shows in the PLSS Internal Corrosion module.  In this section, the following Schedules will be shown by default: - with a Plan code related to Internal Corrosion. - which haven't been credited yet. You can use the filter to see the Credited Schedules. By default, the filter will select the following Plan Codes: - ACFM, - BIOCIDE BATCH PIGGING, - BIOCIDE BATCHING, - CHECK LEAK, - CI SAMPLING, - CLAMP, - CLEANING PIGGING, - CORROSION COUPON RETRIEVAL, - DO INSTALL CLAMP, - EDDY CURRENT, - EROSION ASSESSMENT, - FFS / PDAM ASSESSMENT, - GAS SAMPLING, - GENERIC (SEE INSTRUCTION), - GENERIC ASSESSMENT (SEE NARRATIVE), - GENERIC CORRECTIVE WORK (SEE NARRATIVE), - GUIDED WAVE, - ICDA - INTERNAL CORROSION DIRECT ASSESSMENT, - ILI - ACOUSTIC RESONANCE, - ILI - CALIPER, - ILI - EDDY CURRRENT, - ILI - EMAT, - ILI - MFL, - ILI - UT, - ILI CRAWLER/TETHERED UT, - INHIBITOR BATCHING, - INSPECT ACFM, - INTERNAL CORROSION ASSESSMENT, - INTERNAL VISUAL, - IOW REVIEW, - MEG SAMPLING, - MFL, - NPP - NON-PIGGABLE PIPELINE ASSESSMENT, - OIL SAMPLING, - OTHER ILI ACTIVITY, - OTHER INSPECTION ACTIVITY, - OTHER IOW ACTIVITY, - OTHER PIGGING ACTIVITY, - OTHER SAMPLING ACTIVITY, - PRODUCT BATCHING, - PULSE EDDY CURRENT (PEC), - RADIOGRAPHY, - REPAIR, - REPLACE, - SPHERING / LIQUID REMOVAL, - ULTRASONIC, - WATER SAMPLING. Schedule grid: | Column | Description | | --- | --- | | Schedule | Name and ID of the Schedule. Click on the ID of the Schedule to open the Scehdule. | | Schedule Type | Type of Schedule (i.e. INSPECTION, ASSESSMENT, CAIR, PREVENTATIVE). | | Next Inspection Date | Next Inspection Date of the Schedule. | | Description | Short Description of the Schedule. | | Equipment ID | Equipment to which the Schedule is assigned to. Click on the Equipment ID to open the Equipment Details page. | | Equipment Group | Equipment group to which that Equipment the Schedule is assigned to belongs. | | Scope | Assessment | | Plan codes | Last inspection date on recurring Schedules for which a previous Schedule was already credited. | | Pending status | The status of the Schedule (e.g. Insp Complete, Recalculation, Sched Edit / New Insp). | | Category | Category 1 - Integrity Issue Category 2 - Reliability Issue Category 3 - Long Term Inspection or Reliability Issue | | Last Inspection Date | Last inspection date on recurring Schedules for which a previous Schedule was already credited. | | Status | The current approval status of the event. | | Rec. | Recurring Schedule (true/false). Corrosion Schedules are always recurring. | | Off. | Offline Schedule (true/false). | | Intr. | Intrusive Schedule (true/false). | | Interval | Shows how often a recurring Schedule repeats. | | Calendar | Shows a timeline for the Next Inspection Date (NID) and Next Next Inspection Date (NNID). | | Resp. Discipline | Responsible Discipline, e.g. EI only. | | Schedule Driver | Schedule driver, e.g. RBI-Asset, Corrosion calc, etc. | | Pending Status | The status of the Schedule (e.g. Insp Complete, Recalculation, Sched Edit / New Insp). | | Nr. Of Attachments | Number of attachments. | | Credited/Uncredited | Shows if the Schedule is Creditd or Uncredited. | For more information on Corrosion Schedules see [IMS Schedules](/v414/docs/schedules-overview).