This section contains the Pipeline (elevation) profile, the Booster Stations, and the Tie-Ins sectioning. See learn more about this section see PLSS Equipment Detail Page.
Take note
Tie-ins are not managed within Hydrocor for Internal Corrosion Assessment. Each Tie-in must be defined as a separate section for Hydrocor and corresponding input parameters of Flow rates, Temperature, Compositions, and Fluid properties should be provided. If there are multiple Tie-ins to the Pipeline, then the section of the Pipeline between each Tie-in location must be treated as an independent section.
In the Pipeline profile, 2001 points can be imported. This was always 201 points, but in Hydrocor the limit has been increased to 2001.
In the Pipeline profile, 2001 points can be imported. This was always 201 points, but in Hydrocor the limit has been increased to 2001.