• Beta
PL Internal Corrosion - Sectioning
  • 09 Aug 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light
  • PDF

PL Internal Corrosion - Sectioning

  • Dark
    Light
  • PDF

Article summary

This section contains the Pipeline (elevation) profile, the Booster Stations, and the Tie-Ins sectioning. See learn more about this section see PLSS Equipment Detail Page.

Take note
Tie-ins are not managed within Hydrocor for Internal Corrosion Assessment. Each Tie-in must be defined as a separate section for Hydrocor and corresponding input parameters of Flow rates, Temperature, Compositions, and Fluid properties should be provided. If there are multiple Tie-ins to the Pipeline, then the section of the Pipeline between each Tie-in location must be treated as an independent section.
In the Pipeline profile, 2001 points can be imported. This was always 201 points, but in Hydrocor the limit has been increased to 2001.

Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence