Note: To view categories like Release Notes, Site-Specific Documents, and Recommended Practices, click Login in the top-right corner. If you don’t have a login, sign up with your work email.

RBI 581 Main Screen (grid list)

Prev Next

When API 581 is active the RB Analysis Main Screen (grid list) shows RBI 518 related buttons in the toolbar.

Future Risk (calculating what-if scenarios of acceptable risk changes)

In addition to the RBI 581 button there is a Future Risk button.

The Future Risk button can be used to calculate what-if scenarios of acceptable risk changes.

To calculate the what-if scenarios of acceptable risk changes:

  • Select the relevant analysis rows in the grid.

  • Click the Future Risk button.

  • A model window will pop-up with the selected analyses.