Purpose
The purpose of this document is to describe a Risk Based Inspection (RBI) Methodology for pressure vessels and piping used to optimize inspection intervals, schedules and monitoring tasks to ensure integrity, as well as safe and reliable operation consistent with the S-RBI Methodology.
Detailed Guidance
For detailed Guidance, see the attached PDF.