Aim
To review the Overall Criticality, i.e., base risk for (each) Component – DM combination.
Criticality, together with Confidence (Step10) and RL (Step 6), is used to determine the Maximum Inspection Interval (MII) and Inspection Strategy (IS) (Step 11).
See Methodology Step 9 and Software Step 9.

(4).jpg?sv=2022-11-02&spr=https&st=2026-04-26T15%3A11%3A20Z&se=2026-04-26T15%3A22%3A20Z&sr=c&sp=r&sig=45VpgULlcko7bZhZJDe2woFGHN%2FpB%2BBdlhW2CzMB93g%3D)