Note: To view categories like Release Notes, Site-Specific Documents, and Recommended Practices, click Login in the top-right corner. If you don’t have a login, sign up with your work email.

Step 9 Review Overall Criticality

Aim

To review the Overall Criticality, i.e., base risk for (each) Component – DM combination. 

Criticality, together with Confidence (Step10) and RL (Step 6), is used to determine the Maximum Inspection Interval (MII) and Inspection Strategy (IS) (Step 11).

See Methodology Step 9 and Software Step 9.