The Degradation Management (Using S-RBI) Steps
2 Articles
in this category
Contributors
+ 1
Print
Dark
Light
Contents
The Degradation Management (Using S-RBI) Steps
2 Articles
in this category
+ 1
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
and 1 others
Dark
Light
Step 1 Define the Asset (and set up the Hierarchy)
Aim Before the Degradation Management can start, the Asset needs to be defined in IMS. This entails two elements: (1) the IMS Hierarchy structure needs to be set up; and (2) the asset information must be collected, verified, and stored...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 2 Identify Threats and Barriers (Define the CL)
"> "> "> "> Aim In this step (as part of the Asset definition) the CL must be defined. This includes a definition of the CL boundaries and a process description. It further includes the identification of the Threats ...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 3 Start S-RBI Analysis and Assign DMs to Components
Aim When the CL is defined ( Step 1 and Step 2 ), an S-RBI Analysis must be started. The first step of an S-RBI Analysis is to assign the appropriate Degradation Mechanisms to each Component, since the S-RBI Analysis takes place on Component l...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 4 Determine most Credible Failure Scenario
Aim When all the Barriers on the Component fail, the DM will cause a failure, i.e., a leak or a rupture. We need to establish what the most likely event is if this happens. This is called the credible failure scenario. The Susceptibility to Fail...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 5 Review the Inspection History and Credit DMs
Aim The aim of this step is to specify the last inspection date for each DM (and review and record the condition status of the Component during the last inspection). See Methodology Step 5 and Software Step 5 .
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 6 Estimate RL (AR DMs and CUI)
Aim For AR DMs: Review the Inherited Circuit’s Corrosion Rates (CR) and Allowable Corrosion Rate (ACR), to select a CR and determine the Remaining Life (RL). If present, also take credit for Lining/Coating. See Methodology Step 6 and Softwar...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 7 Determine Susceptibility to Failure
Aim The Susceptibility to Failure should be assessed per DM per Component, according to the specific Special Emphasis Component / DM criteria. The StF, together with the Consequence of Failure ( Step 8 ), will determine the Criticality (...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 8 Rate Consequence of Failure
Aim Determine per Component per DM the Consequences of Failure (CoF) for the Most Credible Failure Scenario (defined in Step 4 ) for the following Consequence categories: Asset: Economic damage to the asset including consequential business lo...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 9 Review Overall Criticality
Aim To review the Overall Criticality, i.e., base risk for (each) Component – DM combination. Criticality, together with Confidence ( Step10 ) and RL ( Step 6 ), is used to determine the Maximum Inspection Interval (MII) and Inspection St...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 10 Assess Confidence
Aim Assess the Confidence in the DM’s forecast, i.e., assessment of StF and the RL (for AR DMs). Confidence, together with Criticality ( Step 9 ) and RL ( Step 6 ), is used to determine the Maximum Inspection Interval (MII) and Inspection Strat...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 11 Review Results – NID, MII, IS, Inspection Effectiveness
Aim The S-RBI deliverables are: A Next Inspection Date (NID) – mainly for AR DMs. An Inspection Strategy (IS) and sometimes Maximum Inspection Interval (MII) – for NAR DMs. A required Inspection Effectiveness* <sup> </sup>– for AR DMs. The ...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 12 Assign S-RBI Results to Schedules and/or update Monitoring Plan
Aim The S-RBI Analysis results, which were reviewed in Step 11 , tell us how and when to inspect / monitor the Components, i.e., how to verify the Barriers. Hardware Barriers are verified through Inspection Schedules at Equipment level - when t...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 13 Barrier Verification - Execute, Analyze, Document
Aim Ultimately, the aim is to verify the status of the Barriers. This is done by means of inspections and monitoring. How and when the inspections and monitoring should take place was specified in Step 12 by assigning the S-RBI results to ...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 14 Maintain Barriers
Aim The aim is to perform corrective actions, which are needed to return the Barriers status to green. See Methodology Step 14 and Software Step 14 .
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Step 15 Review S-RBI Analysis and IOW
Aim Regularly review the S-RBI Analyses and IOWs to make sure that the most recent and applicable information is included in the assessment. This is indicated as an optional step in the cycle, only because it may happen at a frequency that ...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 16 Aug 2024
Calculators
IMS has nine S-RBI calculators interfaced to assist with the assessment. The Calculator tab in the S-RBI Assessment screen provides the following calculators: CUI, UG, tank bottom, HIC/SOHIC, Caustic/Carbonate/Amine/Sulphide/Chloride SCC. Applicab...
Written by
Elsa Tolsma
,
Denis Tkalec
,
Tomislav Renic
Updated on : 09 Aug 2024
RBI NID Calculation - from Equip Start Date and Inspection Date
Below is an example of how the RBI NID is calculated. Component Start Date The Start date is a mandatory Component property that denotes the date the original Component has been put into use. It does not necessarily have to denote the actual Compo...
Written by
Elsa Tolsma
,
Marko Knezevic
Updated on : 07 Sep 2024
Change password!
Changing your password will log you out immediately. Use the new password to log back in.
Current password
Current password is required
New password
New password must be at least 8 characters long. It should contain at least one upper and lower case letter, number, and a special character.
Confirm password
Confirm password must be at least 8 characters long. It should contain at least one upper and lower case letter, number, and a special character.
Confirm password should be same as new password
Update
Change profile
Success!
First Name
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last Name
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
New email
Enter a valid email
Re-enter your password
Enter a valid password
Your profile has been successfully updated.
Update
Logout
ENTER
ESC
Eddy AI, facilitating knowledge discovery through conversational intelligence
Search Limit Exceeded. Please upgrade the plan.
Answer copied!
No results found
Provide more context or information so that I can better understand and assist you