Tying FM Schedules to Upcoming Events

  • Dark
    Light
  • PDF

Article summary

All Fabric Maintenance (FM) Schedules, can be linked to a Planned Event. This is extremely helpful when packaging Schedules that will be done during a turnaround (TA) or similar event.

If a Schedule is linked to an Event, the Schedule’s NID will change when the Event date changes. This also holds for multiple linked Schedules: If the Event date changes, the Site Administrator only needs to change and Approve the Event date in IMS and the NIDs of all the linked Schedules will then automatically be revised to the new date. Note: The default configuration is for the Site Administrator to control the addition and editing of Events, since with a CMMS (e.g. GSAP) interface all related Schedules will be influenced. These then also need to be adjusted on the CMMS side.

A Schedule may also have other dates (e.g., the User Date) taking part in the NID horserace. In this case the most conservative NID is always selected. Thus, only if the TA date is the earliest date in the horserace, will the NID be the same as the TA date.

Reviewing Planned Events

Planned Events (e.g. Next Opportunity, Pit Stop, Turnaround, Statutory Inspection) are registered on each processing Plant or Unit. You will find (and can filter) all Planned Events in the Planned Events Main Menu.

Alternatively, the Planned Events can also be found on Plant and Unit Level in Settings\Company\Toplevel

Each Planned Event has an Event Date.

Linking Events when creating Schedules

To link an Event to a Schedule when it is being created:

  • Click the search icon in the Event Date field to find the applicable Event. Note: Only the Planned Events for the Unit to which the Schedule belongs will be shown.
Graphical user interface, table, website  Description automatically generatedClick the search icon in the Event Date field.

Linking Events later (Editing Schedules)

To link an Event to a Schedule when in Edit mode:

  • Click Edit (see Approving, Editing and Deferring FMA Schedules).
  • Click the search icon in the Event Date field to find the applicable Event. Note: Only the Planned Events for the Unit to which the Schedule belongs will be shown.
  • Click Save when done.
Graphical user interface, application  Description automatically generatedClick the search icon in the Event Date field.
Important
A Schedule must always be Approved after being linked to an Event (see Approving, Editing and Deferring FMA Schedules).

 Schedules can also be linked in bulk via the Planned Event Details Page.


Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence