• Beta
PLSS Campaigns - Main Screen
  • 09 Aug 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light
  • PDF

PLSS Campaigns - Main Screen

  • Dark
    Light
  • PDF

Article summary

Take note
This overview will explain how to use and interpret the IMS-PLSS Campaigns Main Screen.

The Campaigns Main Screen shows an overview grid, with a list of Campaigns.

Listing Campaigns

To see the list of registered Campaigns:

  • Go to the IMS Main Menu
  • Click on Campaigns to go to the Main Screen:
Click on the Campaigns to see registered Campaigns.
  • Use the Scoping bar, the Filter, or the Search functionality to list the desired Campaigns. 

Each record shows several fields, summarizing the Campaigns (see the table below). To see more, click on the Settings icon in the toolbar and add additional fields.

Click on the setting button in the Main Menu to add additional fields to the grid.

Header

Description

Expand/Collapse

The expand / collapse button.

Checkbox

User can tick the checkbox of interest, for example for reporting.

Active

If the Campaign active or in-active

Indicator

Currently empty. Later, after the import, the ECH indicator will be shown here.

Campaign ID

The Campaign ID number, automatically generated.

Campaign type

Indicates the type of the Campaign:

  • CP Testpost Survey
  • Corrosion Assessment Pipelines
  • Underwater Eq. Activities.

Description

A short description, CP Testpost survey Groningen Pipelines.

Campaign date

The date before the campaign should be completed.

Approval status

The status, can be Draft or Final Approved.

Nr Equipments

The number of pieces of Equipment selected for the applicable Campaign.

Nr Schedules

The number of Schedules selected for the applicable Campaign.

Nr Equipment without schedule

The number of pieces of equipment that have been selected in the campaign without a Schedule assigned to the Campaign.

Nr Insp Loc

The total number of Inspection Locations on the selected Schedules.

Nr activities

The total number of Tasks or Activities.

Nr activities to do

After data have been imported and ECHs created, shows the number of ECHs with a green color indicator.

Plancodes

An overview of the Plancodes on the Schedules.

For more information see IMS Main Screen (Grid List).


Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence