• Beta
Special Emphasis - Overview
  • 09 Aug 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light
  • PDF

Special Emphasis - Overview

  • Dark
    Light
  • PDF

Article summary

This online manual explains the Special Emphasis configuration in IMS: 

For Equipment groups Pipe and Pipe System, a Circuit or (recurring) Inspection Schedule can be identified as one of the following:

The classification chosen determines the risk based Maximum Inspection Interval (MII) allowed for the Calculation Summary (and Corrosion Schedule) or Inspection Schedule. (See Assigning Special Emphasis to a Circuit or Inspection Schedule.)

A Special Emphasis thus provides a way to designate a risk based Maximum Inspection Interval (MII) for a corrosion Circuit or an Inspection Schedule

(The aim of Special Emphasis was to configure the MII for specific Special Emphasis Equipment as such that it meets the specific site requirements (e.g.,  Shell DSM requirements). The Special Emphasis can be configured differently for each site.)



Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence