• Beta
Step 11 Review Results – NID, MII, IS, Inspection Effectiveness
  • 16 Aug 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light
  • PDF

Step 11 Review Results – NID, MII, IS, Inspection Effectiveness

  • Dark
    Light
  • PDF

Article summary

Aim

The S-RBI deliverables are:

  • A Next Inspection Date (NID) – mainly for AR DMs.
  • An Inspection Strategy (IS) and sometimes Maximum Inspection Interval (MII) – for NAR DMs.
  • A required Inspection Effectiveness* – for AR DMs. The user can use the S-RBI results (Interval Factor (IF) and Remnant Life (RL)) to determine this. The required Inspection Effectiveness then in turn determines the required combination of Inspection technique and coverage.

*Note: According to API RP 581.

These 3 deliverables determine how and when to inspect, i.e., how to verify the Barriers, and should be reviewed and interpreted, before being assigned to an inspection in Step 12.

See Methodology Step 11 and Software Step 11.


Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence