- Print
- DarkLight
- PDF
Step 9 Review Overall Criticality
Article summary
Did you find this summary helpful?
Thank you for your feedback
Aim
To review the Overall Criticality, i.e., base risk for (each) Component – DM combination.
Criticality, together with Confidence (Step10) and RL (Step 6), is used to determine the Maximum Inspection Interval (MII) and Inspection Strategy (IS) (Step 11).
See Methodology Step 9 and Software Step 9.
Was this helpful? Click to add feedback comments