The Approval Process for Different Objects

Prev Next
  • Published on Mar 9, 2026
The Equipment Condition History (ECH) is used to document historical information obtained during inspections. Significant events in the Equipment lifecycle should be recorded with an ECH. Once the ECH is written (i.e. Approved), it will be a perma...
  • Published on Mar 9, 2026
A Corrosion Schedule is registered for a Circuit containing the data from NDE examinations (UT, RT, etc). Each Circuit has only one active Corrosion Schedule. Thus, when a Circuit is created the application generates such a Corrosion Schedule by d...
  • Published on Mar 9, 2026
Required / Default Schedules are automatically created when the Equipment (DEFAULT) or Circuit (CORROSION) is added. These auto-created Schedules for which the minimal time interval should be set, act as a “safety net”. The DEFAULT Insp time inter...
  • Published on Mar 9, 2026
Planned Events (e.g. Next Opportunity, Pit Stop, Turnaround, Statutory Inspection, RBI Re-assessment) are registered on each processing Plant or Unit. The Planned Events can be found in Planned Events Main Menu , as well as on Plant and Unit Leve...