--- title: "Calculation Summary Overview" slug: "calculation-summary-overview" updated: 2026-03-09T10:15:51Z published: 2026-03-09T11:26:46Z canonical: "ims-handbook.cenosco.com/calculation-summary-overview" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # Calculation Summary Overview The Calculation Summary section (on the [Circuits](/v410/docs/pei-circuits-overview)) summarizes all the CR calculations. These include the [Remnant Life (RL) and Next Inspection Date (NID) Calculations](/v410/docs/remnant-life-rl-and-next-inspection-date-nid-calculations). The Calc Summary contains four tabs, **Summary/Messages** (see [Tab: Summary/Messages](/v410/docs/tab-summarymessages)), **CML Calc Results** (see [Tab: CML Calc Results](/v410/docs/tab-cml-calc-results)), **Totals/Last Insp** (see [Tab: Totals/Last Insp](/v410/docs/tab-totalslast-insp)) and **Corr Rates IF** (see [Tab: Corr Rates IF](/v410/docs/tab-corr-rates-if)), which can be used to review the data. Also, the **CML Measurement History** tab (see [Data Quality (Identifying Anomalies)](/v410/docs/data-quality-identifying-anomalies)) should be reviewed. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/pic%201(37).png?sv=2026-02-06&spr=https&st=2026-11-22T13%3A41%3A14Z&se=2026-11-22T14%3A41%3A14Z&sr=b&sp=r&sig=F%2F66TYq0F%2Fw0k6Rf4Qn0Z9G%2BP1ShtDnnWZv8tGeBba0%3D)The CR data can be reviewed on the different Calc Summary tabs and CML Measurement History tab. When the CR calcs have been reviewed, you must calculate the NID (click the *calculate* button) and then **Final Approve** the data (see [Calculating and Approving the Calc Summary](/v410/docs/calculating-and-approving-the-calc-summary)). The Corrosion Schedule of the Circuit will then be credited and a new NID will be set. Also, if the Circuit is [inherited to an RBI Component](/v410/docs/relationship-between-cls-components-and-circuits), the Calc Summary will automatically be applied in the RBI Analysis **Inspection History** tab, to update the RBI LID (see [](https://ims-handbook.document360.io//v3-14/docs/software-step-6)[Step 5](/v410/docs/step-5-review-the-inspection-history-and-credit-the-dm-1) of the Degradation Management workflow). When done you can also [Generate a Calc Summary Report](/v410/docs/generating-a-calc-summary-report). For more information on how the Calculation Summary fits into the Degradation Management workflow go to [Step 13 Barrier Verification - Execute, Analyze, Document](/v410/docs/step-13-barrier-verification-execute-analyze-document).