Defining Schedules

Prev Next
  • Updated on Mar 19, 2026
  • Published on Mar 9, 2026
The following must be taken into account when defining Inspection Schedules. The Rules The following rules apply to Inspection Schedules: Schedule Lifecycle Steps The Inspection Lifecycle steps are: Create Schedule – Add Plan Codes – &n...
  • Published on Mar 9, 2026
Inspectors often need to make maintenance recommendations. Corrective Action Inspection Requests (CAIRs) can be used to “keep track” of these repair recommendations. CAIRs are Created , Defined , Approved , can also be linked to an Event , and ...
  • Published on Mar 9, 2026
Equipment that has been assessed with RBI , must be re-assessed after at some point, based on the site requirements (e.g., 10 years per API-510/570 and 653). An RBI Re-Assessment can be created at the Equipment level or at the Unit level. RB Re-As...
  • Published on Mar 9, 2026
A Corrosion Schedule is created automatically when a Circuit is created . Its Schedule Category and Schedule Driver will be set automatically based on the Circuit's predefinitions for Corrosion Schedule Defaults . The Corrosion Schedule is cred...
  • Published on Mar 9, 2026
Preventative Schedules allow us to organize preventative maintenance. They are often linked to Barriers . Preventative Schedules are Created , Defined , and Approved , they can also be linked to an Event , and marked for WOP , in the same wa...
  • Published on Mar 9, 2026
Assessment Schedules outline the specific Assessments to be conducted over a set period. Assessment Schedules are Created , Defined , and Approved , they can also be linked to an Event , and marked for WOP , in the same way as Inspection Sche...
  • Published on Mar 9, 2026
Preventive Schedules allow us to organize preventive maintenance. They are often linked to   Barriers . Preventive Schedules are   Created ,   Defined , and   Approved , they can also be   linked to a...
  • Published on Mar 9, 2026
A recurring Schedule can be labeled as a Static schedule . If labeled as a Static schedule , the NID  will be based on the User Date / User Interval and will ignore the Last Inspection Date ( LID ).  Static schedules are meant for...