LOPA Tab

Prev Next
  • Published on Mar 9, 2026
This LOPA tab is used to do the actual  the Layer of Protection Analysis (LOPA) . Here you can define  Initiating Events  (and Frequencies), as well as the  Barriers  (and  PFDs ). Then you can calculate and e...
  • Published on Mar 9, 2026
The LOPA Tab Toolbar can be used to add Initiating Events and Barriers . Also SIFs can be added from here, and this also also from where you can start a calculation. These functions also have associated shortcut keys . The Toolbar func...
  • Published on Mar 9, 2026
The Initiating Events and Barriers grid is organized as cards (cells). Several keyboard shortcuts have been enabled to accelerate the navigation and the editing of the cells, like in an Excel worksheet. These are summarized in the table below. The ...
  • Updated on Mar 15, 2026
  • Published on Mar 9, 2026
The different Consequence Categories ( People , Assets , Community , and Environment ) together with their associated Severity , and Tolerability Criteria per year ( TC ) are shown. For each Consequence category a Safety Integrity Level (SIL) ...
  • Published on Mar 9, 2026
Initiating Events copied from the Consequence’s  associated HAZOP, will show here. These will be indicated with an . If applicable you can create more Initiating Events or change the existing ones (the changes will be synced back to the ...
  • Updated on Jun 1, 2026
  • Published on Mar 9, 2026
When a LOPA is linked to a HAZOP Consequence during creation then the Barriers, copied from the Consequence’s associated HAZOP, will show here. The link will be indicated with a blue circled “H“ on the Barrier card. If applicable you c...
  • Published on Mar 9, 2026
When all the Initiating Events and Barriers have been defined it is time to calculate and review the Overall SIL. Click the calculate button. Note: It will show red when a calculation is required. Evaluate the Overall SIL to...
  • Published on Mar 9, 2026
If the Overall SIL for the Consequence  is not acceptable, you will need to add one or more SIF Analyses and determine (for each SIF Analysis) the minimum required RRF, i.e., its Target PFD , that achieves an acceptable Overall SIL  ...
  • Updated on Sep 2, 2026
  • Published on Mar 9, 2026
The aim of a SIF Analysis is to design the Subsystems such that the 90% upper limit of the Achieved PFD is less than the Target PFD . The Target PFDs are typically established during the LOPA study. In some cases, a SIF Analysis can be starte...
  • Updated on Sep 15, 2026
  • Published on Mar 9, 2026
First you need to make sure the Team Composition has been documented, then you can Approve the LOPA. When the LOPA is Approved and changes are now made in the associated HAZOP, a Syncing warning will show on the LOPA. If desired, you can then ...