Degradation Management using S-RBI
- 3 Sub categories
- 4 Articles
- Published on Mar 9, 2026
This online manual explains the Degradation Management implementation in IMS: How to implement Degradation Management (including the S-RBI Analysis) , step by step, in IMS. How to interpret and implement the S-RBI Analysis results fo...
- Published on Mar 9, 2026
Risk-Based Inspection (RBI) is a risk-based approach to the inspection of Pressure Equipment in the Oil and Gas industry. This type of inspection analyses the Susceptibility to (likelihood of) Failures (StF), and the Consequences of the same Failu...
- Updated on Aug 31, 2026
- Published on Mar 9, 2026
The S-RBI workflow. For more information on the implementation of these steps see The Degradation Management (Using S-RBI) Steps . For more information see S-RBI Methodology .
- 15 Sub categories
- 2 Articles
- Published on Mar 9, 2026
A Reuse Analysis button is available on Equipment Details Page, in the RBI section. Take Note The button is only visible if the current Equipment has no Analysis, while the Parent FLOC do have an Analysis. ...