PL Fit for Service

Prev Next
  • Updated on Sep 1, 2026
  • Published on Mar 9, 2026
Take note This overview explains the fitness-for-service assessment approach in IMS PLSS, which is based on pipeline corrosion defect assessment codes such as DNV RP-F101 and ASME B31G. The fitness for service assessment, in general, is base...
  • Published on Mar 9, 2026
Fitness for Service (FFS) is a quantitative engineering methodology designed to assess in-service industrial assets' structural integrity and operational safety. In IMS PLSS, FFS assessments are conducted exclusively for Carbon Steel Pipelines, Flow...
  • Published on Mar 9, 2026
LimitState/MAT The LimState is the MAT (Minimum Acceptable Thickness) of a corroded pipeline for a specific corrosion morphology and defect assessment code. The following types of corrosion morphology are distinguished: General corrosion. Groov...
  • Published on Mar 9, 2026
From release 3.13C there is a change in the calculation of the number of projection lines in the DNV method. Before 3.13C the projection lines were calculated with the formula: Int(sqrt(Diameter / Wall Thickness/Diameter)) + 1 From release 3.13C ...
  • Published on Mar 9, 2026
Take note This overview will explain how to use the (Non-Pigable Pipelines) NPP module in the IMS PLSS. The NPP Module is part of the FSS Module . Before creating a new NPP case, the following steps must be completed: Fill in all the ...