--- title: "Step 11 Review Results – NID, MII, IS, Inspection Effectiveness" slug: "step-11-review-the-results-nid-mii-is-inspection-effectiveness" status: "update" updated: 2026-10-27T19:59:47Z published: 2026-10-27T19:59:47Z canonical: "ims-handbook.cenosco.com/step-11-review-the-results-nid-mii-is-inspection-effectiveness" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # Step 11 Review Results – NID, MII, IS, Inspection Effectiveness ## ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/SRBI%20(7).jpg?sv=2026-02-06&spr=https&st=2026-11-22T13%3A29%3A27Z&se=2026-11-22T14%3A29%3A27Z&sr=b&sp=r&sig=vW4Tr6YZC%2FtVKdjwhOZPeMaKtiaTSOwdJ6fy4IXn2JQ%3D) ## Aim The S-RBI deliverables are: - A Next Inspection Date (NID) – mainly for AR DMs. - An Inspection Strategy (IS) and sometimes Maximum Inspection Interval (MII) – for NAR DMs. - A required Inspection Effectiveness* [](/v410/docs/step-11-review-the-results-nid-mii-is-inspection-effectiveness#footnote-4)– for AR DMs. The user can use the S-RBI results (Interval Factor (IF) and Remnant Life (RL)) to determine this. The required Inspection Effectiveness then in turn determines the required combination of Inspection technique and coverage. *Note: According to API RP 581. These 3 deliverables determine how and when to inspect, i.e., how to verify the Barriers, and should be reviewed and interpreted, before being assigned to an inspection in [Step 12](/v410/docs/step-12-assign-s-rbi-results-to-inspectioncorrosion-schedules-andor-update-monitoring-plan). See [Methodology Step 11](/v410/docs/methodology-step-11) and [Software Step 11](/v410/docs/software-step-11).