Aim
To review the Overall Criticality, i.e., base risk for (each) Component – DM combination.
Criticality, together with Confidence (Step10) and RL (Step 6), is used to determine the Maximum Inspection Interval (MII) and Inspection Strategy (IS) (Step 11).
See Methodology Step 9 and Software Step 9.

(4).jpg?sv=2026-02-06&spr=https&st=2026-09-22T22%3A50%3A46Z&se=2026-09-22T23%3A01%3A46Z&sr=c&sp=r&sig=Jt7xBSeERxjhV7eqzYDuSSs0l%2BxkOGvHYzMrvmKlcb0%3D)