Aim
To review the Overall Criticality, i.e., base risk for (each) Component – DM combination.
Criticality, together with Confidence (Step10) and RL (Step 6), is used to determine the Maximum Inspection Interval (MII) and Inspection Strategy (IS) (Step 11).
See Methodology Step 9 and Software Step 9.

(4).jpg?sv=2022-11-02&spr=https&st=2026-05-07T18%3A58%3A58Z&se=2026-05-07T19%3A09%3A58Z&sr=c&sp=r&sig=%2BHVGwYJFQ54U6hU7n8Tx0fnyIMtnSQMKc5oqg7k9E3k%3D)