Aim
To review the Overall Criticality, i.e., base risk for (each) Component – DM combination.
Criticality, together with Confidence (Step10) and RL (Step 6), is used to determine the Maximum Inspection Interval (MII) and Inspection Strategy (IS) (Step 11).
See Methodology Step 9 and Software Step 9.

(4).jpg?sv=2022-11-02&spr=https&st=2026-03-23T13%3A59%3A36Z&se=2026-03-23T14%3A10%3A36Z&sr=c&sp=r&sig=%2F1v9C25f0%2F8kJcVOJv1G0R6CTLPllxRB8PJ9AS3J09I%3D)