Tank Load Case Details

Prev Next
  • Published on Mar 9, 2026
Below we show the summary of the Load Cases Calculations for Welded tanks. You will find more information on the calculations in the following articles.
  • Published on Mar 9, 2026
Two Compliance Codes are implemented in IMS for the LC1 calculations: The one is based on the API specifications and the other on a DEP specifications. Each calculation is further split up into specific calculations for each part of the Tank . This...
  • Published on Mar 9, 2026
LC2 calculations takes place on the Equipment . The LC2 calculations (also known as buckling calculation) is to determine the number of wind Girders (a.k.a. stiffeners) required for structural integrity of the tank. Relevant properties are Wind ...
  • Published on Mar 9, 2026
LC3 calculations takes place on the Equipment . This is the Roof calculations that determines a RL based on an effective Roof pressure. There are two relevant calculations done for the LC3: The RL and the compression values. Remnant Life The ca...