--- title: "Age-Related and Non-Age-Related Failure Characteristics" slug: "age-related-and-non-age-related-failure-characteristics-theory" tags: ["PEI", "S-RBI", "Theory"] status: "update" updated: 2026-10-27T23:11:38Z published: 2026-10-27T23:11:38Z canonical: "ims-handbook.cenosco.com/age-related-and-non-age-related-failure-characteristics-theory" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # Age-Related and Non-Age-Related Failure Characteristics As mentioned in [Degradation Classification](/v414/docs/degradation-classification-theory), the DMs can be classified in terms of the failure characteristics (see the figure below): - Age-Related (AR) failures (e.g., Pitting, [general Corrosion](/v414/docs/corrosion-and-remnant-life)), and - Non-Age-Related (NAR) failures (e.g., Cracking). Strategy Based (SB) failures fall in a third category which are closely related to NAR failures. Corrosion Under Insolation (CUI) is currently the only predefined Strategy Based failure in IMS. ![A screenshot of a cell phone Description automatically generated](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/age-related-and-non-age-related-failure-characteristics-image-g17j7g35.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A39%3A18Z&se=2026-10-28T14%3A39%3A18Z&sr=c&sp=r&sig=dws47R7k%2F6TZFC%2BbEkGRXHnpliU3pnbF7%2BNd5GxCSkE%3D) Degradation Mechanisms can be classified in terms of failure characteristics. The table below outlines the AR and NAR failure characteristics.

Age-Related vs Non-Age-Related failures:

| Age-Related failures | Non-Age-Related failures | | --- | --- | | The Degradation Mechanism (DM) has been designed in. Damage is controlled through Barrier management and verification. | The control of DM should be addressed in the design; Barriers are designed in. | | It progresses at a steady rate within operating limits. | Time is not relevant. Occurrence is random when operating outside limits. | | Time to failure should be known. - Corrosion: - Corrosion Rate (CR) - Corrosion Allowance (CA) / Allowable Wall Loss (Barrier) - Creep - Low Cycle Fatigue or Cyclic Loading | Time to fail strongly depends on process upsets/excursions. | | Design life is known. | | | Progress can be quantified and (Barrier) verified. | Rapid progress possible once initiated: - Stress corrosion cracking - Short term overheating | | Failure acceptable within normal design envelope. | Occurrence of failures not acceptable within normal design envelope. Emphasis is on control of the Integrity Operating Window (IOW). | | Verification is done through inspection and IOW monitoring. | Verification is done through IOW monitoring and *opportunity* inspection. | | The ***outcome of an AR RBI Analysis*** is always a Next Inspection Date (NID). | The ***outcome of a NAR RBI Analysis*** is typically a Maximum Inspection Interval (MII) or an Inspection Strategy (IS). | > [!NOTE] > Take Note > > To learn more about the detailed Degradation Mechanisms used in IMS, see: [Degradation Modules Overview](/v414/docs/degradation-modules-1).