--- title: "AW (Authority Witnessing B.V.) Dashboard" slug: "aw-authority-witnessing-bv-dashboard" tags: ["General", "Witnessing"] updated: 2026-10-27T23:11:52Z published: 2026-10-27T23:11:52Z canonical: "ims-handbook.cenosco.com/aw-authority-witnessing-bv-dashboard" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # AW (Authority Witnessing B.V.) Dashboard The [Witnessing](/v414/docs/witnessing-overview) functionality has been developed for sites requiring documented Approvals of inspection activities. Witnessing is a specific feature for additional supervision and authority reviews on Schedules and ECHs, besides the regular Approval flow. The Authority Witnessing B.V Dashboard contains a number of sections, showing information on the Inspection Schedules, CAIRs and ECHs marked for Witnessing. The information shown is listed in the table below. Each Query provides a list (or lists) of Schedules/ECHs. Navigate to the lists by clicking on the links. For more information on how to use the Witnessing dashboards see [Using the Witnessing Dashboards](/v414/docs/witnessing-dashboards). AW Dashboard information: | **Supervision – Authorization Required** | | --- | | Schedule | Inspection Schedules marked for Supervision by a Sr Insp/Eng. Batch update is available to do batch Approve. | | CAIR | CAIRs marked for Supervision by a Sr Insp/Eng. Batch update is available to do batch Approve. | | ECH | ECHs marked for Supervision by a Sr Insp/Eng. Batch update is available to do batch Approve. | | **Supervision - Schedule Authorization Overview** – This includes both Inspection Schedules and CAIRs | | Scope reviewed | Supervised Schedules | | Scope Reviewed - Disapproved by Supervisor | Disapproved Schedules by Supervisor. A review is required by the Inspector. | | Scope Reviewed - Invite Authority for Field Inspection | Schedules for which the Inspector should invited the Authority to do a Field Inspection together. | | Scope Reviewed - Disapproved by Authority | Disapproved Schedules by Authority. A review is required by the Inspector. | | Scope Reviewed - Assigned NCR's by Authority | Schedules with NCRs assigned by the Authority. A review is required by the Inspector. | | Scope Reviewed - Assigned NCR's by Authority Closed | Schedules with closed NCRs. A review is required by the Inspector. | | **Supervision - ECH Authorization Overview** | | ECH Reviewed | Supervised ECHs | | ECH Reviewed - Disapproved by Supervisor | Disapproved ECHs by Supervisor. A review is required by the Inspector. | | ECH Reviewed - Disapproved by Authority | Disapproved ECHs by Authority. A review is required by the Inspector. | | ECH Reviewed - Assigned NCR's by Authority | ECHs with NCRs assigned by the Authority. A review is required by the Inspector. | | ECH Reviewed - Assigned NCR's by Authority Close | ECHs with closed NCRs. A review is required by the Inspector. | | **Authority - Authorization Required** | | Schedule | Inspection Schedules marked for Authority Witnessing. Batch update is available to do Batch Approve. | | CAIR | CAIRs marked for Authority Witnessing. Batch update is available to do Batch Approve. | | ECH | ECHs marked for Authority Witnessing. Batch update is available to do Batch Approve. | | **Authority - Schedules Authorization Overview** – This includes both Inspection Schedules and CAIRs | | No Review Required | Schedules that don’t require a review | | Scope Reviewed - No Field inspection | Authorized Schedules | | Scope Reviewed - Field Inspection Together | Authorized Schedules for which a Field Inspection was requested (together). The Inspector must do a Filed Inspection and invite the Authority. | | Scope Reviewed - Field Inspection Later | Authorized Schedules for which a Field Inspection was requested (individual). The Inspector must do a Filed Inspection, but don’t need to invite the Authority. | | Scope Reviewed - More Information Required | Authorized Schedules where addition information is required (content not entirely clear). A review is required by the Inspector. | | Scope Reviewed - Disapproved | Disapproved Schedules. A review is required by the Inspector. | | Scope Reviewed - NCR Applied | Schedules with NCRs assigned by the Authority. A review is required by the Inspector. | | Scope Reviewed - NCR Closed | Schedules with closed NCRs. A review is required by the Inspector. | | **Authority - ECH Authorization Overview** | | ECH Reviewed | ECH’s reviewed by Authority | | ECH Reviewed - More Information Required | Authorized ECHs where addition information is required (content not entirely clear). A review is required by the Inspector. | | ECH Reviewed - Disapproved | Disapproved ECH’s. A review is required by the Inspector. | | ECH Reviewed - NCR Applied | ECHs with NCRs assigned by the Authority. A review is required by the Inspector. | | ECH Reviewed - NCR Closed | ECHs with closed NCRs. A review is required by the Inspector. | Additional InstructionsFor more information on how to use Dashboards see [Opening Dashboards](/v414/docs/opening-dashboards), [Favoriting Dashboards](/v414/docs/favoriting-dashboards), and [General Dashboard Options](/v414/docs/general-dashboard-options).