--- title: "Defining Corrosion Schedules" slug: "defining-corrosion-schedules" tags: ["PEI", "Schedules"] updated: 2026-10-27T23:11:33Z published: 2026-10-27T23:11:33Z canonical: "ims-handbook.cenosco.com/defining-corrosion-schedules" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # Defining Corrosion Schedules A Corrosion Schedule is created automatically when a [Circuit is created](/v414/docs/creating-new-pei-circuits). Its Schedule Category and Schedule Driver will be set automatically based on the Circuit's predefinitions for [Corrosion Schedule Defaults](https://ims-handbook.cenosco.com/v414/docs/inspection-schedules-settings#corrosion-schedule-defaults). The Corrosion Schedule is credited when the [Calc Summary on the Circuit is Final Approved](/v414/docs/approving-corrosion-circuit-calculations). The Corrosion Schedule is automatically [recurring](/v414/docs/schedule-lifecycle), thus when the [Calc Summary is Approved](/v414/docs/approving-corrosion-circuit-calculations), a new Schedule will be created and the [NID](/v414/docs/next-inspection-date-nid-horserace) set (based on the [CR calculations](/v414/docs/corrosion-rate-calculations-details)). Under normal circumstance it is not necessary to, but you can if desired, [Edit (and then Approve) the Corrosion Schedule](/v414/docs/approving-editing-and-extending-schedules). Take NoteIf the [Circuit is inherit to an RBI Component](/v414/docs/relationship-between-cls-components-and-circuits), when the [Calc Summary is Approved](/v414/docs/approving-corrosion-circuit-calculations) will automatically be applied to the [RBI](/v414/docs/risk-based-inspection-rbi-theory) Analysis Inspection History. This will update the RBI Last Inspection Date (LID). For further explanation see [Step 13](/v414/docs/software-step-13) (Barrier Verification - when the Corrosion Schedule is being executed) and [Step 5](/v414/docs/software-step-5) (Inspection History) of the Degradation Management workflow. You can review the steps of how to Execute, Analyze and Document a Corrosion Schedule in [Step 13](/v414/docs/software-step-13) of the Degradation Management workflow.