--- title: "Dissimilar Welds" slug: "dissimilar-welds" updated: 2026-10-27T23:11:45Z published: 2026-10-27T23:11:45Z canonical: "ims-handbook.cenosco.com/dissimilar-welds" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # Dissimilar Welds ## Take NoteThere are some specific cases where the [S-RBI assessment approach](/v414/docs/work-process-degradation-management-implementation-steps) in IMS PEI changes, depending on the Equipment/Component type. This section gives guidance for Dissimilar Welds. ## Define Asset – Step 1 See [Step 1](/v414/docs/step-1-define-the-asset). In IMS a Dissimilar Weld can be modelled as a separate Component of either a Piping System or an Equipment. On this level the RBI Analysis can then take place. ## Assign DMs to Component – Step 3 See [Step 3](/v414/docs/step-3-start-rbi-analysis-and-assign-dms-to-the-component-1). The DM assigned should be related to the Piping System or Equipment to which the Dissimilar Weld belongs to. ## Assign RBI results to Inspection Schedule – Step 12 See [Step 12](/v414/docs/step-12-assign-s-rbi-results-to-inspectioncorrosion-schedules-andor-update-monitoring-plan). The Dissimilar Weld should have a specific NDE inspection Schedule, but the DM is related to the Piping System (or Equipment) it belongs to. It is recommended to have an inspection Schedule called "NDE dissimilar weld" at the Piping System (or Equipment). Inspect as per its strategy and if needed, plan for repair mitigation.