--- title: "FM Schedule Lifecycle" slug: "fma-schedule-lifecycle" updated: 2026-10-27T23:11:52Z published: 2026-10-27T23:11:52Z canonical: "ims-handbook.cenosco.com/fma-schedule-lifecycle" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # FM Schedule Lifecycle Below the Schedule Lifecycle, from adding (creating) the Schedule to Approving it, is explained. ## The Lifecycle Steps (Inspection and CAIR) The lifecycle steps can be summarized as follows: - Add (create) the Schedule. - Specify the Schedule Scope (this is the Equipment for which the Schedule is being created). - Enter the Plan Codes. (For a CAIR this is the Fabric Maintenance Checklist. For an Inspection this does not apply.) - Enter a Narrative. - Add applicable Attachments. - Final **Approve** the Schedule (Scope and Plan Codes, timing, Narrative should be clear). - Perform the Fabric Maintenance (FM) work / inspection. - Credit the Schedule in the Equipment Condition History (ECH). - Final **Approve** the ECH (all actions that had to be performed must completed and correct). - The current Schedule then becomes inactive. If recurring, a new Inspection Schedule is created automatically (NID=LID+MII). ## Recurring Inspection Schedules Inspection Schedules can be set to be recurring. The [Next Inspection Date (NID)](/v414/docs/next-inspection-date-nid-horserace) will then be equal to the Last Inspection Date (LID) plus the User Interval. The figure below illustrates how a recurring Schedule’s lifecycle will look. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/pic%201(581).png?sv=2026-02-06&spr=https&st=2026-10-28T16%3A05%3A26Z&se=2026-10-28T17%3A05%3A26Z&sr=c&sp=r&sig=qYAjowP7cLibwyN0bzGn3IclAnGdBtHbZvuGgq7JkJI%3D)The lifecycle of a recurring Inspection Schedule.