--- title: "Methodology Step 14" slug: "methodology-step-14" updated: 2026-10-27T23:11:45Z published: 2026-10-27T23:11:45Z canonical: "ims-handbook.cenosco.com/methodology-step-14" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # Methodology Step 14 ## ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/Degradation%20Management%20Final%20(5).jpg?sv=2026-02-06&spr=https&st=2026-10-28T12%3A43%3A04Z&se=2026-10-28T13%3A43%3A04Z&sr=c&sp=r&sig=9xHXcl5L9OVyTiQhk9jo84wu%2Fij8Mo%2BmnZ%2FXAvkND6Y%3D) Step 14 Maintain the Barriers: Below the Step 14 Methodology is described. See also [](/v414/docs/software-step-1)[](/v414/docs/software-step-3)[](/v414/docs/software-step-5)[](/v414/docs/software-step-6)[](/v414/docs/software-step-7)[](/v414/docs/software-step-8)[](/v414/docs/software-step-9)[](/v414/docs/software-step-10)[](/v414/docs/software-step-11)[](/v414/docs/software-step-12)[](/v414/docs/software-step-13)[Software Step 14](/v414/docs/software-step-14). --- Perform the needed corrective actions for the compromised or absent Barriers: - Corrective action for structural IOW exceedances (compromised/absent process control Barrier). - Corrective action (CAIR) for compromised/absent mechanical design (hardware) Barriers. Do this in a way that takes into account the risk rank and mitigation actions that was put in place (see [Step 13](/v414/docs/step-13-barrier-verification-execute-analyze-document)): - Operational Barriers: IOW variables, where routine exceedance follow-up does not result in operation within the IOW window, should follow an escalation scenario resulting in: - Maintenance Notification (Perform Maintenance Execution – ME). - Change of limits (MOC). - Risk ranking and long-term resolution (Manage Threats & Opportunities – MTO). - Mechanical design (hardware) Barriers: Identification and Prioritization of Maintenance Execution Work should be based on the risk (from the S-RBI Assessment). A latest allowable finish date for the corrective action should be determined and a CAIR registered resulting in: - Maintenance Notifications (Perform Maintenance Execution – ME), or - Turn Around (TA) Scope (Perform TA).