--- title: "Schedules Overview" slug: "plss-schedules-overview" updated: 2026-10-27T23:12:05Z published: 2026-10-27T23:12:05Z canonical: "ims-handbook.cenosco.com/plss-schedules-overview" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # PLSS Schedules Overview Take noteThis overview explains the Schedules in IMS PLSS. To learn more about Schedules see [IMS Schedules (across Disciplines)](/v414/docs/ims-schedules-across-discipline). In PLSS, Schedules are created at the Equipment level. A Schedule contains information on: - *When* to perform an activity. - *What* to do. - *How* to do it. In PLSS four Schedule Types have been implemented. A Schedule can be created for: - An Inspection (ILI run, collect CP data, …). - An Assessment (RBA Assessment, Internal Corrosion Assessment, …). - A Corrective Action (a once-off activity). - Preventative Maintenance (cleaning pigging, hydrotest, …). After selecting the Schedule Type, the “What to do” has to be specified by: - selecting the Scope, for example, **Overland Survey**, **Pigging**, or **Sampling**, ….and, - selecting the corresponding Plan for that Scope by clicking on **"What is planned?"** For example, "CP Test Post Survey" is a Plan for the Scope "Overlay Survey". More information on “How to do” the activity, can be specified in the sections Narrative, Tasks, or Attachments. So, each Schedule contains: - A Date, before the Schedule / activity has to be executed. - A Scope depending on Schedule Type. - One or more Plan Codes depending on the Scope. - A Narrative, with a more detailed description of the work. - Attachments, optional. After the activity (activities) in the Schedule has been executed, the results will be stored in IMS-PLSS and the Schedule should be credited in the ECH. See [Creating Schedules](/v414/docs/creating-schedules-inspection-cair-and-rbi-re-assessment). Schedule information can be sent to SAP if the interface to SAP is switched on. To learn more about Schedules see: [IMS Schedules (across Disciplines)](/v414/docs/ims-schedules-across-discipline). ## Attachments - [Schedules and ECH Codes.xlsx](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/Schedules and ECH Codes.xlsx)