--- title: "Step 8 Review the RBI 581 Risk" slug: "rbi-581-risk-matrix" updated: 2026-10-27T23:11:45Z published: 2026-10-27T23:11:45Z canonical: "ims-handbook.cenosco.com/rbi-581-risk-matrix" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # Step 8 Review the RBI 581 Risk Two Risk Calculation Methods are available for the RBI 581 assessment: - [Risk Matrix](/v414/docs/rbi-581-risk-matrix#risk-matrix) (Balanced or Unbalanced). - [ISO Risk Plot](/v414/docs/rbi-581-risk-matrix#iso-risk-plot) ## Specifying which Risk Calculation Method This is done in the [Settings](/v414/docs/setting-up-for-rbi-581-analyses#specifying-which-risk-calculation-method-to-use) per Site / Plant / Unit. ## Specifying the Risk Target Criteria This is done in the [Settings](/v414/docs/setting-up-for-rbi-581-analyses#specifying-the-risk-target-criteria) per Site / Plant / Unit. In case the “Risk Matrix“ is selected, then select the relevant Risk Target Criteria. In case the “Iso Risk Plot“ is selected, specify the rea Acceptable Risk Target and Economic Acceptable Risk Target instead. In addition to the above you can specify the Legal / Local Inspection Interval Target. This is specified per Analysis on the **Risk** Tab. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-A41ZUBP2.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) ## Calculating the Risk Results Click the **Calculate** button in the right Results Pane. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-HAOWV7WB.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) ## Risk Matrix Two Risk Matrices are available for the RBI 581 assessment: - Balanced, and - Unbalanced. The Risk Matrix is shown on the RBI 581 Details Page in the **Risk** tab and in the right section of the RBI 581 assessment details. The gray circle represents the current Risk value, while the blue line indicates the [Criticality Target](/v414/docs/setting-up-for-rbi-581-analyses#specifying-the-risk-target-criteria). The blue circle shows the Next Inspection Date (NID), and the Maximum Inspection Interval (MII) is the number of years it will take for the Risk to reach the NID, which is why an upward arrow is displayed. Below is an examples of the matrix in the **Risk** tab: showing only the Risk circle and the target line. In this case the Risk Target Criteria was set to Medium (M). ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-1D9WVGI0.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) Below is the matrix in the [Results (right) Pane](/v414/docs/rbi-581-results). It shows a more detailed view with the NID circle, Risk circle, target line, and arrow. In this case the Risk Target Criteria was set to Medium (M). ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-OW1DXN8V.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) #### Timeline The "timeline" (a black line with dots) indicates which cells contain dates. Hover on the dot to see the date. Additionally, a moving blue dot represent the current risk (our position on the timeline). ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-64TBX0X4.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) ### Risk Chart and Table (Risk Overview per Assessment) When the [PoF](/v414/docs/rbi-581-probability-of-failure) and the [CoF](/v414/docs/rbi-581-consequence-of-failure) has been calculated, the **Calculate** button in the [Results Pane](/v414/docs/rbi-581-results) becomes enabled. You can then click **Calculate**. The calculation provides a comprehensive series of results that trace the progression of risk from PoF at Age 0 up to PoF at Age 50 years. These results include: - Age: The component's age at a certain point in time. - Date: The date when a certain PoF level is exceeded. - PoF (Probability class): The class of probability. - PoF (Calculated Probability): The calculated probability. - CoF: The Consequence of Failure. - Risk Category: The risk category at a certain point in time. To provide a clear overview of the risk assessment, the data is visually represented in both a chart (on the **Chart** tab) and a table view (on the **Risk Overview per Assessment** tab). The Risk Chart (plot) visually highlights the remaining time until the next predicted change in the Probability of Failure. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-GGOZL95Y.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) To see the information in table format click the **Risk Overview per Assessment** tab. ### Additional Information shown on the Risk tab The **Risk** tab also shows the [Risk Matrix Type](/v414/docs/setting-up-for-rbi-581-analyses#specifying-which-risk-calculation-method-to-use) and the [Risk Target Criteria,](/v414/docs/setting-up-for-rbi-581-analyses#specifying-the-risk-target-criteria) which are defined in the Criticality and Probability Default Values table found in the [RBI 581 Specific Data settings](/v414/docs/rbi-specific-data-settings#rbi-581-specific-data). In addition to the Risk Target Criteria, the Legal/Local Inspection Interval Target can be set to be used as Criticality Target. The Risk Matrix Type and Risk Target Criteria values originate from either site, plant, or unit level and this location name is shown in the Location field. Clicking on the Location name will take you to the settings, where you can modify the default values and access more information (if you have a relevant Role). ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-8YD5I9AL.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) ### Non-Age-Related and Strategy Based Degradation Mechanisms For a NAR or Strategy-based Degradation Mechanism, Age is not considered - meaning the risk remains constant over time. As a result, the Risk Target Criteria, chart and table tabs, and the blue risk target line (seen with Age-Related DFs) are not shown. The future risk indicator is also omitted, since the risk does not change. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-LWFRNHXB.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) ## ISO Risk Plot The ISO Risk Plots provides a continuous, log–log representation of risk, and allow for more detailed analysis of Area and Economic consequences. ### ISO Risk Plot (for Economic Consequence) The ISO Risk Plot for Economic Consequence gives you a continuous, two-dimensional view of risk for an RBI 581 assessment. This plot becomes available when “ISO Risk Plot” is selected as the [Risk Calculation Method](/v414/docs/setting-up-for-rbi-581-analyses#specifying-which-risk-calculation-method-to-use) at the site, plant, or unit level. The plot maps the relationship between: - **Economic Consequence of Failure** — x-axis (displayed in the selected currency) - **Probability of Failure** — y-axis (events/year) Both axes use a logarithmic scale, so you can analyze risk behavior across a wide range of values — something a discrete risk matrix cannot show. The x-axis automatically expands to fit the range of the displayed risk points, ensuring all economic consequence values (including those reaching into the billions) remain fully visible. All values on the plot are shown in the active currency. #### What appears on the chart ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-8FMH5F5N.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) - **ISO Risk Category Lines**: The plot includes ISO risk category threshold lines based on hard-coded values from API RBI 581 (3rd edition). These diagonal lines divide the chart into risk zones (e.g., Low, Medium, Medium-High, High) and are calculated using standard ISO risk equations. They are displayed as dashed lines so you can easily distinguish them from the acceptable risk target. - **Economic Acceptable Risk Target**: If an Economic Acceptable Risk Target has been configured in [Settings](/v414/docs/setting-up-for-rbi-581-analyses#specifying-the-risk-target-criteria), it appears on the plot as a solid blue line. This line represents your organization's acceptable risk level for economic consequences and is displayed alongside the standard ISO category lines, letting you directly compare calculated risk against your defined target. The configured target value is also shown above the plot. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-6XN873CM.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) - **Risk Points**: Risk points on the plot mark the moments when risk reaches an ISO risk category threshold line. Calculations always start from age 0 and identify the points in time at which each ISO risk category line is crossed. Each dot therefore represents a transition into a new ISO risk category, rather than a continuous time-based projection. If the MII calculation stops at MaxRL, a corresponding risk record is created as well. All risk records are listed in the grid below the plot and serve as the source data for the plotted risk dots. > [!NOTE] > Note > > Hover over any risk dot to view its details in a tooltip — Area, CoF, PoF, Risk, Date, and Age at which that risk level will be reached. ### ISO Risk Plot for Area Consequence The ISO Risk Plot for Area Consequence offers a continuous, two-dimensional view of risk for an RBI 581 assessment. It becomes available when you select “ISO Risk Plot” as the [Risk Calculation Method](/v414/docs/setting-up-for-rbi-581-analyses#specifying-which-risk-calculation-method-to-use) at the site, plant, or unit level, under. The plot illustrates the relationship between: - **Area Consequence of Failure** — plotted on the x-axis (m²/year or ft²/year) - **Probability of Failure** — plotted on the y-axis (events/year) Both axes use a logarithmic scale, enabling you to examine risk behavior across a wide range of values — a level of detail not achievable with a discrete risk matrix. The x-axis can expand dynamically depending on the range of displayed risk points, ensuring all Area Consequence values stay fully visible. Values on the plot follow the active unit system. #### Chart contents ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-6BHY0XCK.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) - **ISO Risk Category Lines**: These threshold lines are based on hard-coded values from API RBI 581 (3rd edition) and divide the chart into distinct risk zones (e.g., Low, Medium, Medium-High, High), calculated using standard ISO risk equations. Because they're shown as dashed lines, they're easy to tell apart from the acceptable risk target. - **Area Acceptable Risk Target**: When an Area Acceptable Risk Target has been set up in Settings, it's shown on the plot as a solid blue line, representing your organization's acceptable risk level for area consequences. Displaying it alongside the ISO category lines lets you compare calculated risk directly against this target. The configured target value also appears above the plot. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/image-4L2GWGKN.png?sv=2026-02-06&spr=https&st=2026-10-28T13%3A38%3A34Z&se=2026-10-28T14%3A38%3A34Z&sr=c&sp=r&sig=u7miHVb33SOqnXyyAQQR5JWE9K5vQWrW86aDS3Dmw9U%3D) - **Risk Points**: Each risk point marks the moment at which risk reaches an ISO risk category threshold line. Calculations begin at age 0 and identify the point in time where each threshold is crossed — meaning every dot represents a transition into a new risk category, not a continuous timeline. If the MII calculation stops at MaxRL, a corresponding risk record is generated as well. These records populate the grid beneath the plot and serve as the underlying data for the risk dots shown. > [!NOTE] > Note > > Hovering over a risk dot displays a tooltip with the Area, CoF, PoF, Risk, Date, and Age at which that risk level is reached.