--- title: "RCM Analysis - Strategy Decision (Step 3)" slug: "rcm-analysis-strategy-decision" description: "Explore the Strategy Decision Tree for maintenance strategies, addressing failure prediction and prevention in reliability-centered maintenance." tags: ["Analysis", "RCM"] updated: 2026-10-27T23:11:57Z published: 2026-10-27T23:11:57Z canonical: "ims-handbook.cenosco.com/rcm-analysis-strategy-decision" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # RCM Analysis - Strategy Decision (Step 3) This step covers the Strategy Decision in the RCM Analysis guided workflow. Step 3 addresses the first part of RCM question six of the [seven RCM questions](/v414/docs/starting-an-rcm-analysis#rcm-questions-addressed-during-the-analysis): *What can be done to predict or prevent each failure?* Specifically, it covers the maintenance strategy. The remaining elements of this question — maintenance tasks, MEI economics, and risk reduction — are addressed in subsequent steps. The **Strategy Decision Tree** determines the appropriate maintenance strategy for each Failure Mode. To work through the tree, you need to know whether the Failure Mode is age-related and whether the failure is revealed. This typically requires input from a maintenance craftsperson and a reliability engineer. The possible outcomes are: - Condition-Based Maintenance - Time-Based Maintenance - No Scheduled Maintenance The **Strategy Decision Tree** involves four primary questions, each with sub-questions: 1. **Is it possible to define a clear potential failure condition?** Sub-questions: What is that failure condition? What is the P-F interval, and is it reasonably consistent? Can the task be performed at intervals shorter than the P-F interval? Is the residual risk acceptable? - If yes: Determine a technically feasible on-condition task and enter the P-F interval value. > [!NOTE] > Note > > Click the *Interval* button to change the PF interval frequency. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/interval.png?sv=2026-02-06&spr=https&st=2026-10-28T15%3A10%3A29Z&se=2026-10-28T16%3A10%3A29Z&sr=c&sp=r&sig=g5XL56dYzP7fv%2B06pQgtQhNNhn5WOZ3f%2ByZVVyCF6Xw%3D) - If no: Continue to the next question. 1. **Is there an age at which the conditional probability of failure increases rapidly?** Sub-questions: What is that age? Will a restoration or discard task restore original functionality? Is the residual risk acceptable? - If yes: Determine a technically feasible scheduled restoration or discard task and enter a Safe Lifetime value. - If no: Continue to the next question. 1. **Is the loss of function caused by this Failure Mode on its own, hidden?** - If yes: Is it possible to check whether the item has failed? Is it practical to perform the task at the required intervals? Does the task secure sufficient availability to reduce the probability of a multiple failure to a tolerable level? - If yes: Determine a scheduled failure finding task that is technically feasible. - If no: Continue to the next question. - If no: Continue to the next question. 1. **Is the risk of failure acceptable?** - If yes: Apply a No Scheduled Maintenance strategy (Run to Failure). - If no: Redesign may be required. Together with the information held in [Failure Effects](/v414/docs/rcm-analysis-failure-effects), these answers drive the maintenance task selection in the next step. Once you are done, click **Maintenance Task** to continue to the [next guided step](/v414/docs/rcm-analysis-maintenance-tasks). If the triggering questions are not needed and the strategy result is already known, you can bypass the decision tree by selecting **Overwrite strategy result**. ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/overwrite_strategy.png?sv=2026-02-06&spr=https&st=2026-10-28T15%3A10%3A29Z&se=2026-10-28T16%3A10%3A29Z&sr=c&sp=r&sig=g5XL56dYzP7fv%2B06pQgtQhNNhn5WOZ3f%2ByZVVyCF6Xw%3D) ### Instruction video For a walkthrough of the guided steps, see [RCM Analysis Guided Steps - Episode 7](/v414/docs/rcm-tutorial-videos#rcm-analysis-guided-steps-episode-7). Reliability Centered Maintenance Maintenance Efficiency Index