IMS combines the Confidence and Criticality in a table to determine the IF. The table, shown in the figure below, has the “half-life” and in parenthesis the “full life” values for the IF. Certain Equipment or DMs, such as heat-exchanger tubes, underground piping, CUI and tank floors, uses the “full life” table for the IF determination, while the rest use the “half-life” table. Note: The “full life” is not applicable for air cooler or fin fan tubes, as the impact of a leak will be a release directly to atmosphere.