--- title: "Step 12 Assign S-RBI Results to Schedules and/or update Monitoring Plan" slug: "step-12-assign-s-rbi-results-to-inspectioncorrosion-schedules-andor-update-monitoring-plan" status: "update" updated: 2026-10-27T23:12:55Z published: 2026-10-27T23:12:55Z canonical: "ims-handbook.cenosco.com/step-12-assign-s-rbi-results-to-inspectioncorrosion-schedules-andor-update-monitoring-plan" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # Step 12 Assign S-RBI Results to Schedules and/or update Monitoring Plan ## ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/SRBI%20(8).jpg?sv=2026-02-06&spr=https&st=2026-10-28T11%3A54%3A23Z&se=2026-10-28T12%3A54%3A23Z&sr=c&sp=r&sig=UN85uWePFIQkJFnKqWAtcYzNF9CxCY%2BgtivbcDm5epU%3D) ## Aim The S-RBI Analysis results, which were reviewed in [Step 11](/v414/docs/step-11-review-the-results-nid-mii-is-inspection-effectiveness), tell us how and when to inspect / monitor the Components, i.e., how to verify the Barriers. Hardware Barriers are verified through Inspection Schedules at Equipment level - when the Component/DM is put into the Schedule’s Scope, or Corrosion Schedules. Process Barriers are verified with proactive monitoring plans. These plans should be defined in terms of the Integrity Operating Windows (IOWs) at CL level. Depending on the type of DMs and Barriers, the deliverables for this step thus are: - Inspection Schedules that matches the recommendation / strategy of S-RBI. Note: Inspection Schedules are at Equipment level - RBI Component(s) are added to the Schedule’s Scope for particular DMs; and/or - Corrosion Schedules with IFs based on the Components’ S-RBI Analyses. Note: This is at the Circuit level; and/or - Proactive monitoring plans. Note: This can be defined in terms of the Integrity Operating Windows (IOWs) at CL level. See [Methodology Step 12](/v414/docs/methodology-step-12) and [Software Step 12](/v414/docs/software-step-12). ## Linking RBI Assessments to Circuits and Inspection Schedules Tutorial Video [Embedded content](https://www.youtube.com/embed/gY070nKJFQY?&list=PLiO6hzu_WMKbnaPW20PIicFQ4w0bvpxaz&index=9&t=22s&wmode=opaque&rel=0)