--- title: "Step 13 Barrier Verification - Execute, Analyze, Document" slug: "step-13-barrier-verification-execute-analyze-document" status: "update" updated: 2026-10-27T23:12:55Z published: 2026-10-27T23:12:55Z canonical: "ims-handbook.cenosco.com/step-13-barrier-verification-execute-analyze-document" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # Step 13 Barrier Verification - Execute, Analyze, Document ## ![](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/Degradation%20Management%20Final%20(4).jpg?sv=2026-02-06&spr=https&st=2026-10-28T11%3A52%3A28Z&se=2026-10-28T12%3A52%3A28Z&sr=c&sp=r&sig=uzgxzNjB%2BWH5AuB%2FW8x8rzcHyffpAoE7qkKU3oSsRUM%3D) Aim Ultimately, the aim is to verify the status of the Barriers. This is done by means of inspections and monitoring. How and when the inspections and monitoring should take place was specified in [Step 12](/v414/docs/step-12-assign-s-rbi-results-to-inspectioncorrosion-schedules-andor-update-monitoring-plan) by assigning the S-RBI results to the Inspection/Corrosion Schedule and proactive monitoring plans. The Barrier status will then determine if/how to maintain the Barrier in [Step 14](/v414/docs/step-14-maintain-the-barriers-1). The gathered data should also be used to review the S-RBI Analysis and IOWs in [Step 15](/v414/docs/step-15-review-the-s-rbi-analysis-and-iow). See [Methodology Step 13](/v414/docs/methodology-step-13) and [Software Step 13](/v414/docs/software-step-13).