--- title: "The Safety Lifecycle" slug: "the-safety-life-cycle" updated: 2026-10-27T23:12:18Z published: 2026-10-27T23:12:18Z canonical: "ims-handbook.cenosco.com/the-safety-life-cycle" --- > ## Documentation Index > Fetch the complete documentation index at: https://ims-handbook.cenosco.com/llms.txt > Use this file to discover all available pages before exploring further. # The Safety Lifecycle ![Diagram Description automatically generated](https://cdn.document360.io/e492a0e0-a4ba-4aca-8fc6-76b95f91fdf3/Images/Documentation/SIS-Test_work_order-for-webinar(1).png?sv=2026-02-06&spr=https&st=2026-10-28T15%3A25%3A01Z&se=2026-10-28T16%3A25%3A01Z&sr=c&sp=r&sig=A4EOoV%2BIuUgNaJwo9%2B5yQWjWteoZfEiVXRHYtIJxGzY%3D)The Safety Lifecycle (in IMS SIS). The Safety Lifecycle, a cyclic process where all hazards are identified and analyzed, can be outlined in a few steps: - Determining the Hazard Scenario and Consequence (via a [HAZOP study](/v414/docs/overview-hazop)). - In case of a high Consequence, initiate a [LOPA study](/v414/docs/overview-lopa). - During the LOPA, based on the Initiating Event frequencies, and Barrier PFDs, calculate the Overall RRF and Overall SIL level for the Consequence. - Evaluate the Overall SIL to assess the adequacy of the existing Barriers against the Hazard Scenario. - If the Overall SIL for the Consequence is not acceptable, [start a SIF Analysis](/v414/docs/starting-new-sif-analyses) and determine the SIF’s minimum required RRF, i.e., its Target PFD, that achieves an acceptable Overall SIL level. - [Design a SIS so that each SIF](/v414/docs/sif-analysis-overview)’s Achieved PFD is less than its Target PFD. - Lastly [assign the selected Tests](/v414/docs/assigning-tests-to-equipment-schedules) (with their tuned Test intervals) to the associated Equipment’s Schedules to ensure the SIFs achieve the target PFDs.