Data Quantification RBI Analysis (Component) Criteria
This article explains in detail the RBI Analysis criteria (referring to RBI Components) for the Data Quantification Section on the RBI Dashboard. To learn about the other criteria see RBI Dashboard Data Quantification.
Baseline
Baseline Components must adhere to the following criteria:
The Component type may not be GENERAL
Both the Component and Equipment must be Active
Equipment Status must be In Service or In Construction
Equipment Perform RBI must be checked
RBI components with only scenarios or no assessment
Stage I Components must meet Baseline criteria.
RBI components with scenarios and consequence assessments
Stage II Components must adhere to the following criteria:
Components must meet Stage I criteria
Components must have at least one unexpired analysis and at least one of the following two criteria must be met:
Analysis performed for the NON-CORROSIVE Degradation mechanism
or the Scenario must be filled in and at least one of the consequences assessments must be performed
RBI components with Stage 2 and with StF assessments
Stage III Components must adhere to the following criteria:
Components must meet Stage II criteria
At least one of the following two criteria must be met:
Analysis performed for the NON-CORROSIVE Degradation mechanism
or StF assessment has to be performed
RBI components with Stage 3 and with confidence assessments (corrosive injection and mix points, corrosive deadlegs counted as complete)
Stage IV Components must adhere to the following criteria:
Components must meet Stage III criteria
At least one of the following two criteria must be met:
Analysis performed for the NON-CORROSIVE or any of the strategy-based Degradation mechanisms
or the Confidence assessment has been performed
or Component type is set to any of the following: CORROSIVE INJECTION POINT, CORROSIVE MIXING POINT, CORROSIVE DEADLEG
RBI components with Stage 4 and with Next Inspection Dates with final approved schedule or corrosion circuit
Stage V Components must adhere to the following criteria:
Components must meet Stage IV criteria
At least one of the following two sets of criteria must be met:
Components are in Schedule scope
The Component must be in the scope of a final approved, uncredited Schedule
Analysis must have either RBI NID calculated or an Inspection Strategy
Analysis status must be Analysis completed, implemented
Component inherited on a Circuit
Components must be inherited on a Circuit with a final approved Calc Summary
Analysis status must be Analysis completed, implemented