• Beta
Equipment outside IMS PEI RBI scope
  • 09 Aug 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light
  • PDF

Equipment outside IMS PEI RBI scope

  • Dark
    Light
  • PDF

Article summary

For some Equipment, due to their characteristics (process conditions, design parameters, etc), it is not recommended or possible to perform an S-RBI Analysis in IMS PEI. These are listed in the table below.

Equipment outside the IMS PEI S-RBI methodology scope:

Equipment Type
Comments and References

Civil Equipment

Use IMS PEI (Civil) to apply the Civil RBI methodology. Refer to PEI Civil.

Coke Drums


Critical Check Valves / Non-Return Valves

In IMS Critical Check Valves can be added in Piping Systems Flocs. This way the Critical Check Valve is a stand-alone Equipment, but it’s linked to the Piping System Floc, allowing the user to see if the Piping System is showing internal corrosion issues and allowing the inspector to adjust the inspection Schedule on the Critical Check Valve accordingly.

CUI CCAM Priority 1

See Corrosion Under Insolation (CUI).

Decoking Piping (Erosion)


Expansion Joints


Pipelines

Use IMS PLSS to assess pipelines. 

Soil-to-Air

There is no soil-to-air Component.


Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence