Note: To view categories like Release Notes, Site-Specific Documents, and Recommended Practices, click Login in the top-right corner. If you don’t have a login, sign up with your work email.

PL External Corrosion - Schedules

Prev Next

Take note

This overview will explain the Schedule section in the External Corrosion module of IMS-PLSS.

This section provides, by default, an overview of Schedules related to the applicable piece of Equipment:

  • with Plan codes related to Internal Corrosion,

  • which have not been Credited yet.

The grid looks as follows:

Plan codes that are selected in the filter by default are all related to Externa Corrosion:

  • ACFM,

  • BIOCIDE BATCH PIGGING,

  • BIOCIDE BATCHING,

  • CHECK LEAK,

  • CI SAMPLING,

  • CLAMP,

  • CLEANING PIGGING,

  • CORROSION COUPON RETRIEVAL,

  • DO INSTALL CLAMP,

  • EDDY CURRENT,

  • EROSION ASSESSMENT,

  • FFS / PDAM ASSESSMENT,

  • GAS SAMPLING,

  • GENERIC (SEE INSTRUCTION),

  • GENERIC ASSESSMENT (SEE NARRATIVE),

  • GENERIC CORRECTIVE WORK (SEE NARRATIVE),

  • GUIDED WAVE,

  • ICDA - INTERNAL CORROSION DIRECT ASSESSMENT,

  • ILI - ACOUSTIC RESONANCE,

  • ILI - CALIPER,

  • ILI - EDDY CURRRENT,

  • ILI - EMAT,

  • ILI - MFL,

  • ILI - UT,

  • ILI CRAWLER/TETHERED UT,

  • INHIBITOR BATCHING,

  • INSPECT ACFM,

  • INTERNAL CORROSION ASSESSMENT,

  • INTERNAL VISUAL,

  • IOW REVIEW,

  • MEG SAMPLING,

  • MFL,

  • NPP - NON-PIGGABLE PIPELINE ASSESSMENT,

  • OIL SAMPLING,

  • OTHER ILI ACTIVITY,

  • OTHER INSPECTION ACTIVITY,

  • OTHER IOW ACTIVITY,

  • OTHER PIGGING ACTIVITY,

  • OTHER SAMPLING ACTIVITY,

  • PRODUCT BATCHING,

  • PULSE EDDY CURRENT (PEC),

  • RADIOGRAPHY,

  • REPAIR,

  • REPLACE,

  • SPHERING / LIQUID REMOVAL,

  • ULTRASONIC,

  • WATER SAMPLING