- Print
- DarkLight
- PDF
PL Internal Corrosion - Schedule
In this section, the following Schedules will be shown by default:
- with a Plan code related to Internal Corrosion.
- which haven't been credited yet.
You can use the filter to see the Credited Schedules. By default, the filter will select the following Plan Codes:
- ACFM,
- BIOCIDE BATCH PIGGING,
- BIOCIDE BATCHING,
- CHECK LEAK,
- CI SAMPLING,
- CLAMP,
- CLEANING PIGGING,
- CORROSION COUPON RETRIEVAL,
- DO INSTALL CLAMP,
- EDDY CURRENT,
- EROSION ASSESSMENT,
- FFS / PDAM ASSESSMENT,
- GAS SAMPLING,
- GENERIC (SEE INSTRUCTION),
- GENERIC ASSESSMENT (SEE NARRATIVE),
- GENERIC CORRECTIVE WORK (SEE NARRATIVE),
- GUIDED WAVE,
- ICDA - INTERNAL CORROSION DIRECT ASSESSMENT,
- ILI - ACOUSTIC RESONANCE,
- ILI - CALIPER,
- ILI - EDDY CURRRENT,
- ILI - EMAT,
- ILI - MFL,
- ILI - UT,
- ILI CRAWLER/TETHERED UT,
- INHIBITOR BATCHING,
- INSPECT ACFM,
- INTERNAL CORROSION ASSESSMENT,
- INTERNAL VISUAL,
- IOW REVIEW,
- MEG SAMPLING,
- MFL,
- NPP - NON-PIGGABLE PIPELINE ASSESSMENT,
- OIL SAMPLING,
- OTHER ILI ACTIVITY,
- OTHER INSPECTION ACTIVITY,
- OTHER IOW ACTIVITY,
- OTHER PIGGING ACTIVITY,
- OTHER SAMPLING ACTIVITY,
- PRODUCT BATCHING,
- PULSE EDDY CURRENT (PEC),
- RADIOGRAPHY,
- REPAIR,
- REPLACE,
- SPHERING / LIQUID REMOVAL,
- ULTRASONIC,
- WATER SAMPLING.
Schedule grid:
Column | Description |
---|---|
Schedule | Name and ID of the Schedule. Click on the ID of the Schedule to open the Scehdule. |
Schedule Type | Type of Schedule (i.e. INSPECTION, ASSESSMENT, CAIR, PREVENTATIVE). |
Next Inspection Date | Next Inspection Date of the Schedule. |
Description | Short Description of the Schedule. |
Equipment ID | Equipment to which the Schedule is assigned to. Click on the Equipment ID to open the Equipment Details page. |
Equipment Group | Equipment group to which that Equipment the Schedule is assigned to belongs. |
Scope | Assessment |
Plan codes | Last inspection date on recurring Schedules for which a previous Schedule was already credited. |
Pending status | The status of the Schedule (e.g. Insp Complete, Recalculation, Sched Edit / New Insp). |
Category | Category 1 - Integrity Issue Category 2 - Reliability Issue Category 3 - Long Term Inspection or Reliability Issue |
Last Inspection Date | Last inspection date on recurring Schedules for which a previous Schedule was already credited. |
Status | The current approval status of the event. |
Rec. | Recurring Schedule (true/false). Corrosion Schedules are always recurring. |
Off. | Offline Schedule (true/false). |
Intr. | Intrusive Schedule (true/false). |
Interval | Shows how often a recurring Schedule repeats. |
Calendar | Shows a timeline for the Next Inspection Date (NID) and Next Next Inspection Date (NNID). |
Resp. Discipline | Responsible Discipline, e.g. EI only. |
Schedule Driver | Schedule driver, e.g. RBI-Asset, Corrosion calc, etc. |
Pending Status | The status of the Schedule (e.g. Insp Complete, Recalculation, Sched Edit / New Insp). |
Nr. Of Attachments | Number of attachments. |
Credited/Uncredited | Shows if the Schedule is Creditd or Uncredited. |
For more information on Corrosion Schedules see IMS Schedules.