RCM tasks are typically recurring, used to mitigate the risk of a Failure Mode. Some tasks, however, are date-driven and must respect a fixed due date instead.
Where these schedules are created
RCM schedules that respect a due date are created the same way as any other RCM schedule — under a FLOC or Equipment.
.png?sv=2026-02-06&spr=https&st=2026-10-22T13%3A29%3A35Z&se=2026-10-22T13%3A40%3A35Z&sr=c&sp=r&sig=qqMs7Gj0gjKMSzH%2FKb%2Bb3%2BG%2FGt3z7CMzQE0RPTHe5Yw%3D)
Items that follow a due date
Due-date scheduling typically applies to items where a fixed deadline matters more than a recurring interval — for example, tools, utility equipment, vehicles, and instruments that must be recertified, inspected, or replaced by a specific date.

Examples in IMS
The following are examples of due-date-respecting RCM schedules in IMS.