IMS RCM is used to develop a Maintenance strategy for Equipment based on a Reliability Centred Maintenance assessment. The following release notes describe the new functionality and improvements in version 3.14.
In addition to the stabilizations, version 3.14 contains dynamic form configurator and various new check lists.
System
1. Analysis remapping - when transferring Tags to new Systems
IMSFB-25528
Remapping tags to a new System, from the “Tags and Prioritization” section on the System screen, caused the tag Analysis on the previous System to be expired. To fix the issue an Analysis remapping function was added before the end of the reassignment of tags. This enables users to define where, on the new System, the old Analysis should be moved to.
Users can select “Show tags not yet assigned to current System”.
They can then “Map Failure Mode to Function-Functional Failure of a new System”.
2. Production Losses in Function and Functional Failures grid
IMSFB-6399
Column “Total production losses” is added on the Function and Functional Failures grid.
Column “Total production losses”. Change/Deferral
1. Unit automatically selected - based on selected tag
IMSFB-27918
If empty, the Unit field will automatically be filled in, based on the unit of the selected Location/Equipment.
When a Location / Equipment is selected the Unit field is automatically filled in. 2. Schedule date adjustments
IMSFB-27919
In the below figure the behavior of CHD Schedule dates are clarified.
Clarified behaviour of the CHD Schedule dates. 3. Mandatory tag (Location/Equipment) validation removed
IMSFB-27920
It is now possible to create a new Change/Deferral without providing any Location or Equipment. The new requirement is to have at least one defined Implementation System.
4. DForm – Updated dropdown list for Estimated Remaining Life
IMSFB-27921
The “Basis” field has been renamed “Renewal Basis”, and the dropdown list was updated (see the figure below).
The updated “Renewal basis” dropdown list. 5. Creating Implementation Systems without a Schedule
IMSFB-27922
Now, when no Schedule can be loaded for a specific workorder number, IMS will allow the User to proceed with the creation of an Implementation System. A warning will be displayed to explain that no Schedule was found. In this case, the User will be allowed to manually fill in the “Due Date” and “Last Finish Date”, i.e., the fields usually filled in automatically with the Schedule data.
6. Number of Flocs and Equipment per request
IMSFB-26322
A “#Tags” column was added to the Change / Deferral grid. This field shows the total number of Flocs and equipment per request.
Total number of Flocs and Equipment per request. 7. Updating Approvers/Implementers when request in approval process
IMSFB-13930
When a Change/Deferral request is in the approval process, some Users can still update the list of approves. These Users are:
- Users that have the RCM Admin role;
- Approvers who are defined in the approval stage grid, when the status is “Waiting for approval”;
- Implementers who are defined in the implementation stage grid, when the status is “Waiting for implementation”;
- Users specified for auto approval for the specific Unit (defined in the request), whom also have a role allowing them to add approvers.
If one or more implementers are removed from the implementation stage grid and all other Users already approved the request, then the request will automatically go to the implementation stage.
8. Option to add MOC numbers
IMSFB-14768
Now, when the “Result of MOC” field is checked, Users can enter the MOC number.
MOC number field.
Also, this field can be found on the Change / Deferral grid and in the filter.
MOC number on grid and filter. 9. The “Request Incomplete” shows only missing items
IMSFB-14772
The “Request Incomplete” popup now only shows what is missing, rather than all fields that must be entered.
Showing only missing items. RSL
1. Change the title of a localized RSL
IMSFB-26131
It is now possible to change the title of a localized RSL, but only when the RSL is in draft mode.
Ability to change the title of localized RSL. MEC Optimization Board
1. New Change / Deferrals are prefilled with selected tags
IMSFB-27925
When Users create new Change/Deferral requests from the change log, IMS will prefill the tag fields with the tags from the selected cards. If no cards are selected, IMS will prefill these fields with the tags shown in the change log.
Creating a new change / deferral from the change log. RCM Analysis
1. “Functional Failure Number” and “Function Number” in Analysis grid
IMSFB-13714
The “Functional Failure Number” and “Function Number” columns are now available in the Analysis grid.
The “Functional Failure Number” and “Function Number” columns are now in the Analysis grid. Various Usability Enhancements
1. “FLOC” and “FLOC Description” in the Equipment grid
IMSFB-20339
In the main equipment grid, FLOC and FLOC Description columns were added.
The “FLOC” and “FLOC description” columns are now in the Equipment grid. 2. “RWC” from “RBI specific data” to “Common Data” section
IMSD-31635
The “Functional Failure Number” and “Function Number” columns are now available in the Analysis grid.
RWC is now under Common data section.3. “Select All” in Tags and Prioritization section under System
IMSFB-16639
In the System details, under Tags and Prioritisation section, “Select All” checkbox was added.
“Select All” functionality is now available.4. “Manufacturer and Supplier in Equipment details”
IMSFB-27926
In the Equipment details, Manufacturer and Supplier input fields were changed.
New type of selectors are now available. 5. Task Modified filter
IMSFB-14819
Filter “Modified” is added on task main grid so that the user can filter by last modified task.
Modified filter.Resolved issues
MODULE | COUNT |
No module | 13 |
SAP | 3 |
Analysis | 3 |
Maintenance Library | 2 |
RCM | 1 |
Dashboard | 1 |
Change and Deferral | 1 |
Reporting | 1 |
Import | 1 |
ECH | 1 |
ECS | 1 |
Total | 28 |