• Beta
SIS Schedules Overview
  • 09 Aug 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light
  • PDF

SIS Schedules Overview

  • Dark
    Light
  • PDF

Article summary

This online manual explains:
IMS SIS Schedules (and Tests).

SIS Schedules are aligned with the IMS Schedules as explained in IMS Schedules (across Disciplines). Two Schedule Types are available in SIS: Test and Corrective].

By default only Schedules with the SIS related Discipline (Instrumentation) will be shown in the Schedules Main Screen. It is possible to use the filter to show Schedules from other Disciplines.

Take note that SIS Schedules can be created either on FLOC or Equipment level. Also, when creating a Schedule in SIS it is by default assigned to the SIS related Disciplines.


Schedules can be created for defined Tests on the Equipment, to track when the Tests will be executed. Creating a Schedule can be done from the Equipment Details Page - from the Schedule/Test section, or directly from the Schedule Main Screen.Graphical user interface, text, application, table  Description automatically generated

Schedules will consider multiple sources to calculate the next due date.

Graphical user interface, application  Description automatically generated

A Schedule can also combine multiple Tests that can be executed simultaneously or in different intervals.

Graphical user interface  Description automatically generated with medium confidence




Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence