Step 12 Assign S-RBI Results to Schedules and/or update Monitoring Plan
  • 16 Aug 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light
  • PDF

Step 12 Assign S-RBI Results to Schedules and/or update Monitoring Plan

  • Dark
    Light
  • PDF

Article summary

Aim

The S-RBI Analysis results, which were reviewed in Step 11, tell us how and when to inspect / monitor the Components, i.e., how to verify the Barriers. Hardware Barriers are verified through Inspection Schedules at Equipment level - when the Component/DM is put into the Schedule’s Scope, or Corrosion Schedules. Process Barriers are verified with proactive monitoring plans. These plans should be defined in terms of the Integrity Operating Windows (IOWs) at CL level.

Depending on the type of DMs and Barriers, the deliverables for this step thus are:

  • Inspection Schedules that matches the recommendation / strategy of S-RBI. Note: Inspection Schedules are at Equipment level - RBI Component(s) are added to the Schedule’s Scope for particular DMs; and/or
  • Corrosion Schedules with IFs based on the Components’ S-RBI Analyses. Note: This is at the Circuit level; and/or
  • Proactive monitoring plans. Note: This can be defined in terms of the Integrity Operating Windows (IOWs) at CL level.

See Methodology Step 12 and Software Step 12.

Linking RBI Assessments to Circuits and Inspection Schedules Tutorial Video



Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence