Degradation Management using RBI 581

Prev Next
  • Updated on Sep 1, 2026
  • Published on Mar 9, 2026
RBI 581 is an approach to qualify and quantify risks. It involves detailed calculation methods to determine an inspection plan. The output of the API 581 RBI assessment is the same as the S-RBI output: the inspection frequencies or intervals, the sc...
  • Updated on Sep 1, 2026
  • Published on Mar 9, 2026
The API 581 methodology is covered under 3 parts: Part 1 – Inspection planning methodology Part 2 – PoF methodology Part 3 – CoF methodology Part 1 – Inspection planning methodology Part 1 provides methods used to develop an inspection ...
  • Updated on Sep 1, 2026
  • Published on Aug 31, 2026
RBI 581 forms part of the Degradation Management workflow. Degradation Management IMS tool Workflow Before you can start the RBI 581 Analysis you need to set up your hierarchy and define your Corrosion Loop - this is exactly the same as require...
  • Updated on Aug 31, 2026
  • Published on Mar 9, 2026
Step 1 Define the Asset (and set up the Hierarchy). Below the Step 1 Methodology is described. See also Software Step 1 . Set up the IMS Hierarchy: Create Corrosion Loop, FLOC, Equipment, Circuits, Components To set up the IMS hierarchy , ...
  • Updated on Oct 27, 2026
  • Published on Mar 9, 2026
Step 2 Identify Threats and Barriers (Define the CL):  Below the Step 2 Methodology is described. See also Software Step 2 . Define the Corrosion Loop Boundaries For more information on where to place the Boundaries see Corrosion Loops...
  • Updated on Aug 31, 2026
  • Published on Aug 31, 2026
The Criticality and Probability Default Values will be prepared for you by Cenosco, since a CSA role is required. To make changes to these settings please contact Support . Setting up the Management Systems Factor (FMS) The Management Systems F...
  • Updated on Aug 31, 2026
  • Published on Mar 9, 2026
Below steps explain of to start an RBI 581 Analysis. As an example we look at the Degradation Mechanism EXTERNAL CHLORIDE STRESS CORROSION CRACKING (EXTCLSCC). Starting RBI 581 Analysis To start the RBI 581 assessment: First, create the Equipm...
  • Updated on Aug 31, 2026
  • Published on Mar 9, 2026
After starting an RBI 581 assessment you can add the Inspection History for your Component. This is required for the PoF analysis. To add an Inspection History for the Component: Go to the Inspection History & Specs section. Sta...
  • Updated on Aug 31, 2026
  • Published on Aug 31, 2026
The Probability of Failure (PoF) calculation varies per Degradation Mechanism. Below this is explained for the Degradation Mechanism EXTERNAL CHLORIDE STRESS CORROSION CRACKING (EXTCLSCC). Calculating the PoF Add the inspection histor y for the...
  • Updated on Aug 31, 2026
  • Published on Mar 9, 2026
The second tab on the RBI 581 Details Page is the Consequence of Failure (CoF) calculation. Unlike the Probability of Failure (PoF) calculation, the CoF calculation remains the same regardless of the Degradation Mechanism (DM). This calculation ...
  • Updated on Aug 31, 2026
  • Published on Mar 9, 2026
Two Risk Calculation Methods are available for the RBI 581 assessment: Risk Matrix (Balanced or Unbalanced). ISO Risk Plot Specifying which Risk Calculation Method This is done in the Settings per Site / Plant / Unit. Specifying the...
  • Updated on Aug 31, 2026
  • Published on Mar 9, 2026
The data shown on the RBI 581 Results Pane (on the right) is live (changes with time). In the header (next to the Risk title you can see when it was last updated. When the PoF and the CoF has been calculated, the Calculate button in the...
  • Updated on Aug 31, 2026
  • Published on Mar 9, 2026
The Degradation Management section in the RBI 581 Details Page includes an Approval and Tasks tab. This can be used for managing Approvals, Inspection Effectiveness, and Tasks. There are four sections that appear based on your progress. Progre...
  • Updated on Mar 20, 2026
  • Published on Mar 9, 2026
The RBI 581 Main screen shows an overview grid, with a list of RBI 581 Analyses. Listing RBI 581 Analyses (the Overview Grid) To see the list of RBI 581 Analyses: Go to the IMS Main Menu. Click   RBI 581   to go to the RBI 58...
  • Published on Mar 19, 2026
Depending on your site’s setup, you may have only S‑RBI, only RBI 581, or a mixture of both RBI methodologies available for your site’s Equipment. If you would like to change your current setup, please contact Cenosco Support . When both S‑RBI and...
  • Published on Mar 19, 2026
An “RBI 581 Overview” Dashboard is available. To learn how to open the Dashboards go to Opening Dashboards . Refer to General Dashboard Options to learn how to use your Dashboard optimally. The Dashboard shows: Number of Equipment with perf...
  • Published on Mar 9, 2026
An RBI 581 API service is available. This can be accessed via the IMS Developer Portal . This portal acts as a bridge between IMS and developers, allowing third parties to develop apps that can access and use the data stored and managed in IMS. ...